This Notice serves as a Pre-Solicitation Synopsis for upcoming work required by the National Park Service at Boca Chita Shoreline - BISC. This is not a solicitation. Responses to this Notice are not required.
The NPS anticipates soliciting SAM.Gov on a Total Small Business Set-Aside basis for Erosion Control/Mitigation at the aforementioned site.
NAICS: 237990
Wage Determination: Davis Bacon Wage Determinations will apply for all counties where work takes place (Florida).
Selection Method: FAR 14 Sealed Bidding
Anticipated Period of Performance: 220 Days
Estimated Project Magnitude: $1M - $5M
Attached for consideration are the A&E developed Specifications & Drawings.
Please be on the lookout for the official solicitation early to mid-December 2026 which will be posted on Sam.Gov.
CO: Cole Johnson, Cole_Johnson@ios.doi.gov
COR: Laura Sherwood, Laura_Sherwood@nps.gov
The scope includes shoreline stabilization of the northeast corner of Boca Chita Key, involving rock revetment construction, site preparation, chain link safety fencing, turbidity barrier and erosion control, and landscaping. The project includes mobilization/demobilization, earthwork, dredging of 723 cubic yards of material, installation of rip-rap revetment with geotextile filter fabric, and planting of mangroves and seashore paspalum. The contractor is responsible for all transportation of personnel and materials; the NPS boat will not be made available. Work is limited to the limits of disturbance shown on drawings, and the site is ecologically sensitive.
We post new excavating opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"A04_-_Specifications_1.pdf"4344220"file"".pdf""1""2026-11-17T20:05:03.342+00:00""bed1776aa1da445b8dad20043c2b558a""public""0""public""913e73acd5d7407e9a1835a19b3bfd94""0"2"0""A06_-_Drawings_1.pdf"4242809"file"".pdf""1""2026-11-17T20:05:03.342+00:00""cae3bbd434284c3293e5928cd31a485a""public""0""public""16e55ce97e94412dac964950245657bd""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 1443f41a3698422b82eee6aed7d7e9d8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.