On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1.
On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.
Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete.
Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.
Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform all work as described in the drawings and technical specifications. The work includes building an addition and renovating the Central Utility Building (CUB), including demolition, new foundations, structure, façade, HVAC, electrical, plumbing, fire protection, and site work. The project includes milestones for completion of the CUB extension by January 31, 2029, existing CUB upgrade by June 29, 2029, and final completion by September 28, 2029. The critical schedule constraint is Fermilab's accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030.
We post new general contractors opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""Amend 02 to RFP 376508-CD.pdf"127388"file"".pdf""1""2026-10-07T14:06:55.561+00:00""807284e332a543dead3f2cbc06a2d28d""public""0""public""50f13e4c2c5f46378bd4b26f822118cb""0"21"0""Amend 01 to RFP 376508-CD.pdf"162448"file"".pdf""1""2026-10-06T21:00:29.017+00:00""e7545032fedb4f43aa15d47b0c840414""public""0""public""6f06ed8b81964052bff6509d47a828bd""0"20"0""1.0 RFP 376508-CD Instructions to Offerors.pdf"317249"file"".pdf""1""2026-09-17T14:49:18.407+00:00""d6b3d3c89dc1436f811844cec5c8846c""public""0""public""c674eee08d614d2eb92f6417ff2e524a""0"19"0""Exhibit A - Scope of Work UIP SP-1 CUB.pdf"257877"file"".pdf""1""2026-09-17T14:49:18.407+00:00""de7e2a34012e4d078fb99de53df7235f""public""0""public""2776fc9ea226447e898405d92f4ff63a""0"18"0""Exhibit B- Construction Drawing Set.pdf"110633480"file"".pdf""1""2026-09-17T14:49:18.407+00:00""b58630311a4b452282ad61645ffc55ae""public""0""public""847c1161803847399b682001416f76ed""0"17"0""Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf"30125626"file"".pdf""1""2026-09-17T14:49:18.407+00:00""b94d9198b39b4362bd2e178eab3099f4""public""0""public""1d9cb17c1e7042358e151e97e6eef851""0"16"0""Exhibit D- Geotechnical Engineering Report.pdf"38716325"file"".pdf""1""2026-09-17T14:49:18.407+00:00""28bd9d5e544746a182817e653b271c4d""public""0""public""d3573211828f45d79c51e24f1987effd""0"15"0""Exhibit E- Electrical (LV) Calculations.pdf"355726"file"".pdf""1""2026-09-17T14:49:18.407+00:00""269125e345964d4fae2fd0aa7f17b38f""public""0""public""cc1dcfe84c9b4d788dc02bdd36aa10f3""0"14"0""Exhibit F- Army Corp NPR-Letter.pdf"162033"file"".pdf""1""2026-09-17T14:49:18.407+00:00""50e14e5486b74fbfa1ef68395010b31a""public""0""public""dbe3d221cae445fb9732d1b6c1844701""0"13"0""Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf"327302"file"".pdf""1""2026-09-17T14:49:18.407+00:00""ae74e3cd4348426e87459023c2304ec9""public""0""public""efd3980e719040e58e69e5fd63c1d12c""0"12"0""Exhibit H - Construction Insurance Requirements.pdf"250976"file"".pdf""1""2026-09-17T14:49:18.407+00:00""01a039a1596e45c195992b6dbde706b2""public""0""public""a59221cdc10c41108aa7e6f23478e7ce""0"11"0""Exhibit I - Statement of Acknowledgment (SF-1413).pdf"715281"file"".pdf""1""2026-09-17T14:49:18.407+00:00""46d23fc0ceea44d9ae0a656ac7df25d0""public""0""public""b6ae4895daa54105b26700f11bc683b4""0"10"0""Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf"1456964"file"".pdf""1""2026-09-17T14:49:18.407+00:00""cc05d3720012421386dd97c265bf18fc""public""0""public""b70514e3091a4197b34d1aa9f6e23f43""0"9"0""Exhibit K- Price Proposal Form.pdf"751316"file"".pdf""1""2026-09-17T14:49:18.407+00:00""233504068a584b20b46b7bd9b7a62c97""public""0""public""1c7022aa6736414a8b35ca6f1a7dfa18""0"8"0""Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf"487222"file"".pdf""1""2026-09-17T14:49:18.407+00:00""3a621df5a94b4c19b233894dc06b7de3""public""0""public""b8f2bd1649534820a2ae830d2d4bf0ad""0"7"0""Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf"487205"file"".pdf""1""2026-09-17T14:49:18.407+00:00""f5343a9f2bc64071bcdd2c16898a07aa""public""0""public""adc13c6f5c6c43b2ad9d4e0bd992af45""0"6"0""Exhibit N- Bond Bid FL-41.pdf"767109"file"".pdf""1""2026-09-17T14:49:18.407+00:00""c866ee56e34c4abead943e00e7a3869a""public""0""public""b182caa947bf41f7b110b7c64a088464""0"5"0""Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf"1688977"file"".pdf""1""2026-09-17T14:49:18.407+00:00""7ff4e3e7bb684812b8c4c23537b85f59""public""0""public""9a6ab56df1824e0a86ac47146003bdc3""0"4"0""Exhibit P- Performance Bond_FL-40.pdf"760783"file"".pdf""1""2026-09-17T14:49:18.407+00:00""a979179672fd48d7945ea3baf6e03399""public""0""public""8ee2511fcd924a59904a1d95b7dddc21""0"3"0""Exhibit Q- Davis Bacon Wage Rate.pdf"493378"file"".pdf""1""2026-09-17T14:49:18.407+00:00""007db4985f654d0aa794f06615feed01""public""0""public""65417431a6944fa0bcb5c74ed1af0ac5""0"2"0""Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf"765311"file"".pdf""1""2026-09-17T14:49:18.407+00:00""ac12ffbcb3b44dfba83c2f983488b5e5""public""0""public""0d60dede5542466ab3f9c45a8acaddbe""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 14034cd5817d49c38056351ef936d097), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.