11/5/2026 - Amendment 0001 has been added. See the attached SF30 and the following attachments:
Questions and Answers
Map
Attachment B Submission Package Revised
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12444627Q0003 is issued as a Request for Quotation (RFQ) for the repair/replacement of a fire hydrant.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110. The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Supply and install one fire hydrant and valve in place of a damaged existing hydrant following site visit evaluation. Supply CA-7 stone around base and shoe for proper drainage of barrel after use. Supply required pedestrian traffic control for work being completed in public way. Supply trench protection to comply with OSHA standards. Supply backfill in green area to match existing surrounding grades. Dispose or recycle all removed hydrant, valve, and pipe materials off-site in accordance with federal, state, and local laws and regulations. Provide adequate water for prosecution of work and minimize dust release. Ensure spill cleanup materials are available on-site at all times. Contractor shall comply with all State and local safety requirements, Forest Service Safety Code, and OSHA standards. Equipment shall be modern design in good operating condition with competent qualified operator. All contract heavy equipment and off-road equipment must be washed down and inspected prior to entering the site to ensure invasive plant species are removed. Testing required upon completion includes visual inspection, hydrostatic/leak inspection, full operational test, drainage test, flow test, and main valve closure test with detailed documentation.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""Amendment 0001.pdf"202873"file"".pdf""1""2026-11-05T18:31:28.066+00:00""437b1a33f9224d57837f6848197c647a""public""0""public""c99db9c2f4d04aa6a09abf1faaa621b8""0"13"0""Questions and Answers.docx"19724"file"".docx""1""2026-11-05T18:31:28.066+00:00""f94297b520c04549b77422ea00ca17b6""public""0""public""3cdc3c64faaf4252a754352a0e208ef6""0"12"0""Map.pdf"2616399"file"".pdf""1""2026-11-05T18:31:28.066+00:00""4507ad7873d7411b9a2f8bf0c0a47be4""public""0""public""0619bf2d29cb478493a561a1466ebc44""0"11"0""Attachment B Submission Package Revised.docx"23399"file"".docx""1""2026-11-05T18:31:28.066+00:00""5c5e2ae412f04e30a076401106b2fce9""public""0""public""3f8f5efe1cd24360ba46bf01d51fd9f0""0"8"0""12444627Q0003 RFQ Hydrant Replacement MDW.pdf"339508"file"".pdf""1""2026-10-29T18:18:47.591+00:00""69cbaed846ba4675b1efc1ee0247db8e""public""0""public""89d4975b5b0e4ceea9e063e48b0dd187""0"7"0""Attachment A Statement of Work.pdf"99724"file"".pdf""1""2026-10-29T18:18:47.591+00:00""16317897627848939b97901ae6b80ae7""public""0""public""e695dd123a3046cca7157d0e3c04c16f""0"5"0""Attachment B Submission Package.docx"23381"file"".docx""1""2026-10-29T18:18:47.591+00:00""28bfd6f9e1054d63859b67c255132a34""public""0""public""3d4ddbd057fd48c9aea8cea8b257ef5b""0"3"0""Attachment C Wage Determination.pdf"352811"file"".pdf""1""2026-10-29T18:18:47.591+00:00""2f23dfbb6f6d49b194a45f20be4b4226""public""0""public""1ae778726112418f93a92199065385e3""0"2"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.