COMBINED SYNOPSIS/SOLICITATION
This is a combined synopsis/solicitation, which is expected to result in award of a Firm Fixed Price contract for commercial services, to provide industrial water treatment of cooling towers, package boilers, high temperature water (HTHW) central heating plan, central steam plant, heat exchanger heating systems and closed loop systems at Wright-Patterson Air Force Base (WPAFB). Please see the attachment 3 – PWS Industrial Water Testing & Treatment for further description.
The synopsis is prepared in accordance with the format in the Revolutionary FAR Overhaul (RFO), Subpart 12.2 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. An award, if any, will be made to the responsible offeror who submits a proposal that (1) conforms to the requirements of the synopsis; (2) that receives a rating of “Acceptable” on the Technical factor; and (3) that submits the proposal with the lowest total evaluated price (TEP), provided that the TEP is not unbalanced and is fair and reasonable. Proposal evaluation does not permit tradeoffs between price and non-price factors. The Government reserves the right to award without discussions or make no award at all depending upon (1) the quality of proposals received and (2) the price fair and reasonableness of proposals received.
Proposals must be received no later than 1:00 PM EDT Friday October 09, 2026 via email by the following Points of Contact (POC): Primary – Ashley Schneider Email: ashley.schneider.2@us.af.mil, Secondary – Andrew Petersen Email: andrew.petersen.3@us.af.mil. Please see attachment 1 Instructions to Offerors for additional information along with all other pertinent attachments as well.
The contractor shall provide all personnel, equipment, materials, labor, treatment chemicals, laboratory support, and consultation services for industrial water treatment. Services include routine and non-routine testing, monitoring, inspections, reviews and analysis, studies, and reporting. The contractor must maintain water chemistry within specified standards (e.g., Langelier Saturation Index, conductivity, bacteria counts) and provide weekly, quarterly, and annual reports. The contractor shall also calibrate government chemical feed and control equipment and provide a quality control program.
We post new environmental & testing services opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"45433-5344""WRIGHT PATTERSON AFB""OH""USA""CP 937 656 5842""1940 ALLBROOK DR BLDG 1 RM 109""Industrial Water Treament QA.pdf"58270"file"".pdf""1""2026-09-25T17:04:10.843+00:00""30fc30a78ead468090e4105690b22664""public""0""public""5d56afb0fa1a4175b10bd5278208f76c""0"41"0""Solicitation - FA860126R0018.pdf"963963"file"".pdf""1""2026-09-10T15:57:24.929+00:00""f5c4298921df44c3903c12382ac0418a""public""0""public""52ae372a5a484ac3a3e996d12f58af4c""0"40"0""Attachment 1 - Instruction to Offerors (with Financial Capability Statement).pdf"502676"file"".pdf""1""2026-09-10T15:57:24.929+00:00""771c5fd76bc342cbb72be1ec25772de2""public""2026-09-25T17:04:10.843+00:00""1""public""622a14f2b9164742b92692646fa325ee""0"36"0""2026-09-25T17:04:10.843+00:00""Attachment 1_Instruction to Offerors_Amend1.pdf"284477"file"".pdf""1""2026-09-25T17:04:10.843+00:00""288d7a8d9b9e479d8b01334aa438dee8""public""0""public""b33772897f2f4b5b9482fc9c764b4d02""0"32"0""Attachment 2 - 52-212-2 Addendum to Evaluation_Factors.pdf"447485"file"".pdf""1""2026-09-10T15:57:24.929+00:00""1f5bfb88b0f444039a27889a1edecf43""public""0""public""5fe2fb4a05e64398acab74fc2a0b6dbd""0"29"0""Attachment 3- Performance Work Statement (PWS).pdf"310273"file"".pdf""1""2026-09-10T15:57:24.929+00:00""577249dc320046cb887147cd6c5ec458""public""0""public""e42a91c65124413294f70016ae81128e""0"20"0""Attachment 4 - Air Force Required Language.pdf"87999"file"".pdf""1""2026-09-10T15:57:24.929+00:00""3f4c1393ef11436badfc5df8cc4506e6""public""0""public""bc7ef7a4f47a4e62a275a81a9803bd71""0"14"0""Wage Determination.pdf"102024"file"".pdf""1""2026-09-10T15:57:24.929+00:00""46d1f1b74ab54328910d111e1ae396ec""public""0""public""36853566a62f4ef7b5fcb5e39420e530""0"10"0""Bid Schedule_IWT.xlsx"35579"file"".xlsx""1""2026-09-10T15:57:24.929+00:00""a0d879c0743c46798d9888db1e094c00""public""2026-09-25T17:04:10.843+00:00""1""public""a308c0cc4f174fa18a51425708247643""0"9"0""2026-09-25T17:04:10.843+00:00""Bid Schedule_IWT_Amend1.xlsx"33756"file"".xlsx""1""2026-09-25T17:04:10.843+00:00""315c2ee412aa481f958777c3793140b4""public""0""public""8d925ceed3cc4e50894b49c4417dd634""0"7"0""Appendix H- 01 35 43 WPAFB GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS.pdf"479625"file"".pdf""1""2026-09-25T17:04:10.843+00:00""3ba529f35fe34ff5b1a56d8f10598071""public""0""public""7a0d5201727844caac6ffbfb25500059""0"6"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0e4f6c46e61f4bd289c258c53251ca9a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.