The 49th Contracting Squadron (49 CONS) at Holloman AFB is soliciting proposals for Vertical Transportation Equipment (VTE) Maintenance, Repair, and Inspection Services.
The Contractor shall provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect the real property VTE at Holloman AFB to ensure continuous and safe operation. Services are "full maintenance" as described in the Performance Work Statement (PWS) Paragraph 1.0, with the exception of the specific exclusions identified in Paragraph 2.0 (such as alterations, vandalism, and cosmetic interior cleaning), which will be handled as Over and Above (O&A) work. See PWS for full requirements.
All services shall be performed on-site at Holloman Air Force Base, New Mexico (NM).
DO NOT PRICE O&A Work Contract Line-Item Number (CLIN). This CLIN will be funded as needed and approved IAW PWS Para 2.0 and Appendix D & E.
The contractor will be responsible for maintaining and inspecting fifteen (15) VTE units. The complete workload is detailed in PWS Appendix A. Contractor is not responsible for maintaining or inspecting decomissioned unit.
IAW DoDI 1100.22 and R-DFARS Clause 252.237-7023, the Government has designated VTE services as essential. Offerors are required to submit a written Mission-Essential Contractor Service Plan with their proposals detailing how uninterrupted services will be maintained during a crisis.
It is asked to review all attachments carefully and completely, to include entirety of SF1449.
IAW RFO 5.101(d), Timing, the following information is provided to combine the Presolicitation Notice with this solicitation:
Point of Contact (POC) / Contracting Officer (CO): Ms. Sally D. Roberts, at sally.roberts@us.af.mil or (575) 572-5293 AND Contract Specialist: Alex Coulombe, at alex.coulombe@us.af.mil or (575) 572-0183.
Set-Aside: Total Small Business
Codes:
PSC: J039
NAICS: 561210
Description: Maintenance and repair of fifteen (15) VTE units at Holloman AFB, NM. See above description and attachments for more information.
SUBMISSIONS:
Evaluation: This award will be made based on Lowest-Priced Technically Acceptable (LPTA).
Submission Channel: Send proposals to the Contracting Officer (CO), Ms. Sally D. Roberts, at sally.roberts@us.af.mil, Contract Specialist, SSgt Alex C. Coulombe, at alex.coulombe@us.af.mil, and Alternate Contract Specialist, SrA Raymond Arbouet-Banton, at raymond.arbouet-banton.ca@us.af.mil.
Questions and Answers: All questions must be submitted in writing to the Contracting Officer and Contract Specialists, no later than 4 November 2026, 08:00 AM MST. Questions will be answered promptly (expected NLT COB (4:00 PM MST) 6 November 2026).
Submission: Proposals must be submitted in writing, via email, to the Contracting Officer and Contract Specialists, no later than 12 November 2026, 11:11 AM MST.
Site Visit: No site visit will be provided.
Pre-award Conference (via TEAMS): November 24, 2026
Performance Start Date: December 01, 2026
Thank you for your interest in reviewing this solictation. We look forward to seeing your proposals.
The contractor will provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect fifteen real property vertical transportation equipment units at Holloman AFB for continuous and safe operation under full maintenance, including monthly servicing, annual safety inspections per ASME A17.1, five-year and three-year tests for traction and roped hydraulic elevators, routine response within two work days and emergency response within one work day, plus required Maintenance Control Program, Quality Control Program, and monthly and annual reports, with excluded alterations and other defined items performed as Over and Above work.
We post new electrical opportunities in New Mexico as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"88330-8225""HOLLOMAN AFB""NM""USA""DAVID L. GOLDFEIN STREET""BLDG 29 SUITE 2160""Solicitation - FA480127Q0006.pdf"1555331"file"".pdf""1""2026-11-02T16:41:35.875+00:00""ecb08cb1b8f64fc290f764b93ed48f1f""public""0""public""7806c48fbe744d96a1fee50adc8c509f""0"10"0""Appendix A. VTE Equipment Listing.docx"38667"file"".docx""1""2026-11-02T16:41:35.875+00:00""be04d26716774d2cac2d9eff3498f007""public""0""public""95f7170b0a6d4085bd9ff63214e96544""0"9"0""Atch 2 WD 1986-01177 Rev 60_6.05.2026_27Q0006.docx"35631"file"".docx""1""2026-11-02T16:41:35.875+00:00""c5ba80708ed340c294eef031bde106c8""public""0""public""231d8fceeee14c4bbffc2b9777a1dcbb""0"8"0""Atch 3 NCIC Base Access 8May26_27Q0006.pdf"2337632"file"".pdf""1""2026-11-02T16:41:35.875+00:00""588506d0b9de4f9c8076182053ccf64d""public""0""public""6ff6b0709c4f4e45abe50e1e7f25cf38""0"7"0""Appendix E. Over and Above Work Request Form PDF w signature blocks.pdf"1521090"file"".pdf""1""2026-11-02T16:41:35.875+00:00""d9c77451d1f349afbc84feba89d0554b""public""0""public""0691469798cf445f9d618b43c14b9a19""0"6"0""Atch 4 Mission Essential Memo for VTE_Signed_27Q0006.pdf"2087052"file"".pdf""1""2026-11-02T16:41:35.875+00:00""31cf26b003504d2b94eea92e55cdfc5c""public""0""public""1ec2556b97814ed98c72c478ddb0d855""0"5"0""Atch 1 PWS dtd 16 Sep 2026 VTE_Signed.docx"528007"file"".docx""1""2026-11-02T16:41:35.875+00:00""59c8dcd10ddc408ea7b8f7e5ff5cc450""public""0""public""170c366f24ed41cc8a056cb7e8f190d4""0"4"0""Appendix D. Over and Above Project Instructions.docx"41347"file"".docx""1""2026-11-02T16:41:35.875+00:00""f5523ac0be3646819b36563d20814b36""public""0""public""bd1e523b146946a0aac33051b7f38739""0"2"0""Appendix C. Contractor Submittals.docx"41087"file"".docx""1""2026-11-02T16:41:35.875+00:00""084731452c144607b2a1394bd40609e8""public""0""public""c2408d4dc00a4fca8bc9d38ef7fbc467""0"2"0""Appendix B. Publications, Instructions, Standards.docx"38330"file"".docx""1""2026-11-02T16:41:35.875+00:00""8148a2c7ba11433db4e9b1a68d679637""public""0""public""a4c982cbafa94cabb5c1e481218b0072""0"1"0"Most New Mexico work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0d8c0d5c64454823be1bfbe040d1182c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.