Pre-Solicitation, C-5 Flap Asymmetry Brake Overhaul
NSN: 1680-01-525-8920 (and 1680-01-164-0384)
Part Nos: 5903-105L (4C95003-105L) and 5903-105K (4C95003-105K)
The United States Air Force (USAF) has a requirement for depot-level overhaul and configuration upgrade of the C-5 Flap Asymmetry Brake. This critical flight control component is part of the Secondary Flight Control Flap System used on the C-5 Galaxy aircraft. It is designed to stop the flap system when an asymmetrical condition is detected in flight, preventing uneven aerodynamic loads and severe damage to the wings and flap actuation system.
The purpose of this requirement is two-fold:
Overhaul of the 5903-105L configuration assets.
Overhaul and Upgrade of the 5903-105K configurations to the final 5903-105L configuration.
This effort will utilize a firm-fixed-price (FFP) Requirements Type Contract. The projected period of performance is five (5) years, consisting of a one (1) year basic period and four (4) individual one-year ordering periods.
To be eligible for award, offerors must be pre-approved by the Government's Design Control Activity (C-5 AFLCMC/SPO Engineering) in accordance with the Source Pre-Qualification Requirements (SQS). The USAF anticipates this acquisition will be a Full and Open Competition among qualified sources under the SQS, with the basis of award being Lowest Price/Technically Acceptable (LPTA).
The Best Estimated Quantities (BEQ) for each ordering period are outlined below:
Overhaul CLIN x001 (P/N 5903-105L)
Year / Period BEQ
Basic 30 EA
Ordering Period I 30 EA
Ordering Period II 30 EA
Ordering Period III 35 EA
Ordering Period IV 35 EA
Overhaul & Upgrade CLIN x002 (P/N 5903-105K)
Year / Period BEQ
Basic 10 EA
Ordering Period I 10 EA
Ordering Period II 10 EA
Ordering Period III 10 EA
Ordering Period IV 10 EA
(Note: Best Estimated Quantities for No Fault Found (NFF) and Beyond Economical Repair (BER) CLINs are estimated at 1 EA per period.)
The formal Request for Proposal (RFP) will be posted to the SAM.gov webpage. NO HARDCOPIES WILL BE PROVIDED. All responsible sources qualified under the SQS (or currently seeking qualification) may submit a proposal, which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and any amendments/revisions.
The work involves two tasks: overhaul of the 5903-105L configuration assets, and overhaul and upgrade of the 5903-105K configurations to the final 5903-105L configuration. The effort will utilize a firm-fixed-price (FFP) Requirements Type Contract with a projected period of performance of five years, consisting of a one-year basic period and four individual one-year ordering periods. Best Estimated Quantities (BEQ) for the basic period are 30 EA for overhaul (CLIN x001, P/N 5903-105L) and 10 EA for overhaul & upgrade (CLIN x002, P/N 5903-105K).
We post new vehicles & fleet opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"31098-1670""ROBINS AFB""GA""USA""CP 478 926 3980""235 BYRON ST BLDG 300 STE 19A""SQS Repair_Flap Asymmetry Brakes_20260218.pdf"199560"file"".pdf""1""2026-11-25T13:58:53.534+00:00""24a0f7252da745b885ab10e7a2d92a9a""public""0""public""97ca5b87541046a8ac85676da24e798b""0"1"0"Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0d7ce0783355464fbd4035c82bc772f4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.