We'll email you new hvac opportunities in South Carolina as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Solicitation number 1240BE27Q0018 is issued as a Request for Quotation (RFQ) for the replacement of an existing 3-ton packaged heat pump system with a new, high efficiency ENERGY STAR certified unit that also satisfies FEMP federal purchasing requirements for energy consuming products. The unit serves the Laboratory at the Santee Experimental Forest located at 3734 SC-402, Cordesville, SC 29434.
Please see attached solicitation and supporting documents for a full description of the requirement.
Amendment P00001:
The purpose of this amendment is to remove conflicting statements in section 4.1 of the Statement of Work.
This amendment adds site visit contact information in section 9.0 of the Statement of Work.
Revised contact information has been added to pages 10 and 11 of the combined synopsis solicitation.
The contractor shall furnish all labor, materials, equipment, tools, supervision and incidentals to recover refrigerant per EPA rules, demolish and remove the existing packaged unit, thermostat and wiring/condensate, provide and install one new 3-ton ENERGY STAR-certified single packaged heat pump with new 7-day programmable thermostat, electrical disconnect, pad/anchorage, controls and condensate management, then perform manufacturer startup, verify airflow and performance, provide owner training and deliver product data, commissioning report, as-builts, warranty registration and EPA recovery documentation.
"US""US""97601""KLAMATH FALLS""OR""USA""FREMONT WINEMA NF KLAMATH FALLS""2819 DAHLIA STREET""C04_Sol_1240BE27Q0018_CSS_Commerical Products and Services_Amd 1.pdf"337722"file"".pdf""1""2026-11-16T21:14:27.067+00:00""d32e27af69654827a119dcea68a8a2c4""public""0""public""93564a07ae42441aa5a6ed8b97ff5271""0"12"0""C05_Sol_1240BE27Q0018_Amd_0001.pdf"84959"file"".pdf""1""2026-11-16T21:14:27.067+00:00""c48b988cef81486389bd820a9afc8eba""public""0""public""475e6dad216b402798862552671ffff6""0"11"0""C04_Statement of Work Rev 2.pdf"881465"file"".pdf""1""2026-11-16T21:14:27.067+00:00""900bdd2b1a1d4a5c95965d4a555382fe""public""0""public""e822aa7a41484ee09181080f19fdb6b6""0"10"0""C04_Sol_1240BE27Q0018_CSS_Commerical Products and Services_Final.pdf"335570"file"".pdf""1""2026-11-09T21:20:46.879+00:00""3be6bb4fc5394c8fa8747f7cc9b8fa08""public""2026-11-16T21:14:27.067+00:00""1""public""c77c1abdcc2c45b697631be20fc78114""0"7"0""2026-11-16T21:14:27.067+00:00""C04_Statement of Work.pdf"854216"file"".pdf""1""2026-11-09T21:20:46.879+00:00""f8e3ce6bde5448e3960b7d4303c10f0a""public""2026-11-16T21:14:27.067+00:00""1""public""c171828c52264558ad06c84093c9b715""0"6"0""2026-11-16T21:14:27.067+00:00""C04_Schedule of Items.pdf"45114"file"".pdf""1""2026-11-09T21:20:46.879+00:00""0edf7b3761dd41b28286a0e56ee115a1""public""0""public""a2a8f1b8aa044b1b992761e06840d2e4""0"3"0""C04_Wage Determination 2015-4427 Rev 35.pdf"4462731"file"".pdf""1""2026-11-09T21:20:46.879+00:00""c2368531e7814164a17d6434f43ef7dc""public""0""public""dc4cc95471354bf0a5545ee97f67bb01""0"2"0"Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0c6976fa45ef4784b85d5abdb17cf525), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.