RFQ 36C26327Q0060
Amendment 0002
Questions and Answers for solicitation posting
The contractor shall provide all labor, materials, supervision, tools, safety equipment, testing instruments, transportation, and incidentals to drain, flush, clean, and refill two closed-loop glycol heating systems. Work includes sampling existing fluid, calculating system volume, draining fluid to storage totes, coordinating disposal, flushing the loop with deionized water (four complete loop volumes per flush), cleaning Y-strainers and feeder tank, verifying glycol feeder tank function, refilling with new propylene glycol heat transfer fluid, and testing concentration with a refractometer. The contractor must also provide pre-flush fluid sampling reports, system volume calculations, documentation of flush cycles, final system condition reports, refractometer concentration readings, and disposal manifests. The work shall be performed at the Omaha VA Medical Center, 4101 Woolworth Avenue, Omaha, Nebraska 68105.
We post new plumbing opportunities in Minnesota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""55101""Saint Paul""MN""USA""316 Robert Street N""Suite 506""36C26327Q0060 0002_1.docx"29888"file"".docx""1""2026-10-30T16:33:08.97+00:00""4167515a52164dbc9d32a0f4c8a3ce6b""public""0""public""bdcd835a9bf24693aaafb3ba6b275998""0"7"0""Questions and Answers.pdf"245104"file"".pdf""1""2026-10-23T18:58:27.852+00:00""0fb961a73b494e13b2683672c13993ef""public""0""public""00df9fa9553249899a0f206fa4c52745""0"6"0""S02 - Amendment 36C26327Q0060 0001.pdf"178293"file"".pdf""1""2026-10-23T18:58:27.852+00:00""3b0407a4c7f94056b363dd9c27189f79""public""0""public""836d920e5a214f9388e79a0d27265287""0"5"0""36C26327Q0060 0001_1.docx"15484"file"".docx""1""2026-10-23T18:58:27.852+00:00""f6e42f7b4e164759abf6868c2b34c62d""public""0""public""a26b78fcd09043d9b42c7ced498e93d0""0"4"0""WD - 2015-5005 Douglas County.pdf"257570"file"".pdf""1""2026-10-14T21:12:44.703+00:00""e2a23b62bf2844a088690350934327ea""public""0""public""585ee9594c624565944f14480f16c3ac""0"3"0""S02 - 36C26327Q0060.pdf"607272"file"".pdf""1""2026-10-14T21:12:44.703+00:00""4b83460cca774777afd1b09a0ff0591e""public""0""public""465f4c5d34e2420a97197fa8709986a8""0"2"0""36C26327Q0060_1.docx"16321"file"".docx""1""2026-10-14T21:12:44.703+00:00""6df3a21a6e514c9e9eb516ded8fe14dd""public""0""public""e5dca08c10d64814a57667c129a6f585""0"1"0"Most Minnesota work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0bee5a6bef12460298b75b9691339c4f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.