AUTOMATIC TRANSFER SWITCH FOR PHILIP NORTH SWITCHING STATION
AUTOMATIC TRANSFER SWITCH FOR PHILIP NORTH SWITCHING STATION
The contractor must furnish equipment and material not furnished by WAPA and install a Government-furnished automatic source transfer switch (240V, 400-amp) at the Philip Substation in Philip, SD, per the attached specification. The switch must meet NEMA and UL standards, be electrically operated and mechanically held, and include a controller with LCD display, time delays, communication module, and power monitoring. Delivery is FOB Destination to Philip, SD, and WAPA will unload using a forklift/compact loader. Only new equipment is accepted, and the quote must include manufacturer brand, country of manufacture, and descriptive literature.
We post new goods & materials opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""59101""BILLINGS""MT""USA""2900 4TH AVE. NORTH""https://www.fedconnect.net/FedConnect/?doc=89503427QWA001335&agency=DOE"0"link""1""2026-11-09T19:28:52.434+00:00""b3dc98498c204158b9ed5f31dfbf260e""public""0""Click here to see more information about this opportunity on FedConnect""public""bd8802b90dcf4b5bbd87dd604a5f1492""0"1"0"Most Montana work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0ba2bfc4ca774ed8a3f867acf6c130d5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.