We'll email you new structural work opportunities in New Jersey as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Amendment 0002 This amendment adds specification 02 82 13.13 Glovebag Asbestos Abatement to the list of specifications in section B.2, 2.10 A) of this solicitation and answers received vendor questions.
Amendment 0001 answers contractor questions.
General Information 2.1 Location Work performed under this scope shall be for and conducted within the VA New Jersey Health Care System (VANJHCS) at the East Orange VA Medical Center, located at 385 Tremont Ave, East Orange, NJ 07018, and Lyons VA Medical Center, located at 151 Knollcroft Rd, Lyons NJ 07939. 2.2 Purpose This Statement of Work (SOW) is for an IDC for demolition and abatement efforts supporting construction and repair services at VANJHCS Medical Centers. These services shall be provided on an as needed basis, for a five-year term. VANJHCS has various sized projects that require a Contractor to perform the demolition and abatement portion of this work necessary to accomplish this goal. The minimum value for this IDC is $10,000.00 with a maximum dollar value of $2,000,000.00. 2.3 Scope A description of all individual demolition and abatement tasks covered under this IDC contract can be found in the contract Line Items. The contractor shall provide all labor, materials, equipment, tools, transportation, supervision, safety, quality control and management necessary to fulfill the requirements of task orders issued by the Government under this contract. All work completed under this contract shall comply with applicable Infection Control requirements and the New Jersey Administrative CodeA (NJAC) 5:23-8, Asbestos Hazard Abatement Subcode, and NJAC 12:120 governing asbestos abatement, licensing, and permitting requirements. Additional administrative and management related requirements are described in Section 3: Requirements. Material testing and air monitoring services required while performing asbestos removal services shall be provided by the VANJHCS at no cost to the contractor. No work outside the defined Statement of Work (SOW) shall be performed without written authorization from the Contracting Officer (CO). Unauthorized work may be deemed Unauthorized Commitment (UAC) and may not be reimbursed. The Contractor shall be responsible for all means and methods and shall ensure all work is performed in a safe, compliant, and professional manner.
The contractor provides all labor, materials, equipment, tools, transportation, supervision, safety, quality control and management for demolition and abatement task orders, including flooring, partition, ceiling, door, electrical, plumbing and finish removals, asbestos flooring/mastic, pipe insulation by glovebag and above-glovebag methods, fittings, Transite, plaster, drywall compound, duct and radiator insulation, lead-based paint and miscellaneous ACM removal, cleanup and disposal, containment and ICRA Level 4 measures, mobilization, emergency call-in response, and off-hours/weekend work in compliance with Infection Control requirements and NJAC 5:23-8 and NJAC 12:120, with material testing and air monitoring provided by VANJHCS.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT REVISED.xlsx"89602"file"".xlsx""1""2026-10-02T18:27:36.629+00:00""f3f9a4fa70034e35a60ba5b6710938eb""public""0""public""583295b4f2164b748eaa958e9da3241b""0"16"0""WD Somerset 8-13.docx"31801"file"".docx""1""2026-10-02T18:27:36.629+00:00""15c53530bc3441e0b25447c458e6014c""public""0""public""76c0db1d8c524b038dea731c090aafa7""0"15"0""VAAR 852.219-75 corrected.docx"16019"file"".docx""1""2026-10-02T18:27:36.629+00:00""3283d513ed5f4d14b266a48b2c6d9b61""public""0""public""5e1570b7c3074323aad14cd298ec40b6""0"14"0""EXHIBIT C - Past Performance Questionnaire - revised v2.docx"559093"file"".docx""1""2026-10-02T18:27:36.629+00:00""ec9285f4e79e476299631db39903e3ee""public""0""public""cebd3ac8e6b14a0eb952b793418cbc9e""0"13"0""36C24226Q0857 0002.docx"33216"file"".docx""1""2026-10-02T18:27:36.629+00:00""afdaf67b5968403a94b063efbe121d92""public""0""public""49905f668bda4f0cbabaca7d35f73c2f""0"11"0""36C24226Q0857 0001.docx"123501"file"".docx""1""2026-09-23T13:28:54.314+00:00""7291ec2c2e3b465080223fee21ff261c""public""0""public""559f9f4210fd455fac18a0ad000e4510""0"10"0""EXHIBIT C - Past Performance Questionnaire - revised.docx"558662"file"".docx""1""2026-09-23T13:28:54.314+00:00""7d680e3d11004d51bb0d1ec20be47f0c""public""2026-10-02T18:27:36.629+00:00""1""public""5861c12e0f9c4196984ee0170e01e544""0"9"0""2026-10-02T18:27:36.629+00:00""EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx"21930"file"".docx""1""2026-09-16T13:36:54.699+00:00""cb863af193e048cd8b9c829f4242bb5d""public""0""public""5a17555456684435b67ab4ddb63eb775""0"6"0""VAAR 852.219-75.docx"28859"file"".docx""1""2026-09-16T13:36:54.699+00:00""2a29173125b143c4b97a32bbf7faf0ee""public""2026-10-02T18:27:36.629+00:00""1""public""d4355ce25ccf47229fd69179165cbdcd""0"5"0""2026-10-02T18:27:36.629+00:00""LINE ITEM PRICING SHEET LYN-EO DEMOLITION AND ABATEMENT.xlsx"89323"file"".xlsx""1""2026-09-16T13:36:54.699+00:00""505e25069e344f1cad02839555d23308""public""2026-10-02T18:27:36.629+00:00""1""public""773e9b91cd4941cca493eb843d1cc78a""0"4"0""2026-10-02T18:27:36.629+00:00""WD Essex.docx"34049"file"".docx""1""2026-09-16T13:36:54.699+00:00""627b20a75c7642debca558fc6b0dc562""public""0""public""dde5d3012b5b46b2b5c2031fc7ff4e79""0"3"0""WD Somerset.docx"33006"file"".docx""1""2026-09-16T13:36:54.699+00:00""bb1d7a206ebd4369b4a92060e5563ee8""public""2026-10-02T18:27:36.629+00:00""1""public""9b499143c6b74192bca01847dd71139c""0"2"0""2026-10-02T18:27:36.629+00:00""36C24226Q0857_1.docx"146719"file"".docx""1""2026-09-16T13:36:54.699+00:00""1f7ff76547504ed68313baf2f328341f""public""0""public""06296a576ef64724b0ec10826e022b70""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 09b00f8a06aa4e6e8b706862447b6a9d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.