USFWS_Wichita, KS_Great Plains Nature Center Rehabilitation_A-E Title III Services
Amendment 1 - Due Date extended to November 30, 2026
Description: This project is for an Architect-Engineer (A-E) to provide Construction Administration
Services (Title III Services) for the Great Plains Nature Center Renovation project.
Location: Great Plains Nature Center
6232 East 29th Street North
Wichita, KS 67220
Period of Performance: 300 Days after NTP
Site Visit: Site Visits at the Great Plains Nature Center will be available upon request.
Date for submission of Questions: Date for submission of questions is by 1200 EST, 11/30/2026. Submit questions to Theo Ikner, Contracting Officer@ Thomas_ikner@ios.doi.gov
Solicitation Package
RFP #140FGA26R0032 ¿ 21 Pages
Statement of Work ¿ 7 pages
GPNC Drawings ¿ 31 Pages
Instructions to Offeror:
Before submitting an offer, read the entire solicitation package carefully. Return the following items with your response:
SF 330 including all portions listed for evaluation Factors
SF 1447 Acknowledgment of any/all Amendments to Solicitation
Proposal Due Date: 11/30/2026 1200 EST
Your proposal shall be electronically submitted to the Contracting Officer: @Thomas_ikner@ios.doi.gov
If your firm is unable to meet the due date for reasons outside of your control, please notify the Contracting Officer as soon as practicable.
DESCRIPTION
This project is for an Architect-Engineer (A-E) to provide Construction Administration
Services (Title III Services) for the Great Plains Nature Center Renovation project.
Period of performance for Title III Services will be from the date of contract issuance
until 300 days, unless modified by the Contracting Officer. The work of this contract shall
be provided from December 2026 ¿ October 2027(estimated). The intent is to provide
support to the Great Plains Nature Center Renovation project, from solicitation through
completion of construction.
Task 1 ¿ Attend Teleconference Construction Support Kick-Off Meeting
Task 2 ¿ Perform Construction Support Services
Task 3 ¿ Provide On-Site Inspections and Reports
Task 4 ¿ Perform Commissioning Services
Task 5 ¿ Prepare Updated As-Built Drawings
See Statement of Work and solicitation for Full Task Details and requirements.
The A-E will provide Construction Administration Services for the Great Plains Nature Center Renovation project. The work includes five tasks: Task 1 – Attend a Teleconference Construction Support Kick-Off Meeting; Task 2 – Perform Construction Support Services, including reviewing and responding to approximately 25 construction-originated RFIs and reviewing and approving approximately 200 submittals, and participating in approximately 44 teleconference construction meetings; Task 3 – Provide On-Site Inspections and Reports, including approximately 14 engineering inspections during milestone construction events and 25 construction field inspections approximately once a week during active construction, and preparing inspection punch lists; Task 4 – Perform Commissioning Services in conformance with ASHRAE Standard 202-2013; and Task 5 – Prepare Updated As-Built Drawings in both .dwg and .pdf formats.
We post new architecture and design opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140FF027R0002_Amd_0001.pdf"205520"file"".pdf""1""2026-11-17T21:21:38.451+00:00""e68126ad40254bc6b3024165813825c9""public""0""public""666222e9c2a0489b84d2e971068ac59f""0"5"0""B08_Solicitation_A_E_FF027R0002_GPNC_Title_III_amendment_1_11_17_26_0001.pdf"531544"file"".pdf""1""2026-11-17T21:21:38.451+00:00""9e8ca12454fb497cbd849ce0033447a3""public""0""public""bc2e2a8b39a949f3a457b3e5f4fbde6a""0"4"0""Sol_140FF027R0002.pdf"538370"file"".pdf""1""2026-10-23T18:09:10.691+00:00""7356383050fd4fc89603dbe037b76724""public""0""public""68015e20891549ed9a1f9fa673042642""0"3"0""A04_SOW_Title_III_GPNC_Visitor_Center_10_20.pdf"203884"file"".pdf""1""2026-10-23T18:09:10.691+00:00""4c9a5bd8e61f448098f71c6feb6d7e96""public""0""public""44d95daabad1481985a4a39c005ee553""0"2"0""A04_Great_Plains_Nature_Center_Drawings.pdf"11506181"file"".pdf""1""2026-10-23T18:09:10.691+00:00""2d3529c977904a6a8cd4d2caf9246b20""public""0""public""24acb52dce67445bb55e4683ed12e2ab""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 096d5eb0917145abb8ad5ad5add50a37), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.