We'll email you new fencing opportunities in Washington, DC as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
7 LAKES FENCE REPAIR
The contractor must remove approximately 19,000 linear feet of existing steel T-post and barbed wire fence, including all wood posts, steel posts, stress panels, end panels, and minor drainage crossings. The contractor must then construct 19,000 linear feet of new 4-wire fence (bottom wire barbless, top 3 wires barbed) with steel T-posts, 42-inch long by 2.5-inch diameter non-treated wood stays between each line post, and 4 wire gates (12 feet with wood stays). The contractor must furnish all materials, including barbed wire, barbless wire, steel fence posts, wood posts and braces, and wood stays meeting detailed specifications. The contractor must also dispose of all debris (wood posts, poles, steel posts, and wire) which becomes the contractor's property, and is responsible for legal disposal. No blading is allowed; clearing shall be by brush hog or comparable equipment limited to a 12-foot swath. Access roads shall not be constructed without written approval. The work is located in Carbon County, Wyoming.
"Sol_140LL027Q0034.pdf"534769"file"".pdf""1""2026-11-19T15:07:00.955+00:00""b7ab25dacf2f4f2ea5fbb92a54db30ae""public""0""public""4a129bf09b0f4197ab36a4fbe5ac6404""0"7"0""A06_Drawings.pdf"197079"file"".pdf""1""2026-11-19T15:07:00.955+00:00""5ee8e6b24956453e9d1b61c6835e165c""public""0""public""0e11de1a3c864c51abae8d36a0191a22""0"6"0""A04_SOW.pdf"294013"file"".pdf""1""2026-11-19T15:07:00.955+00:00""94afe1533d094897aa3203445c79cf6b""public""0""public""236ea96929c141b4b6690412a4623e05""0"5"0""A06_Maps.pdf"7496468"file"".pdf""1""2026-11-19T15:07:00.955+00:00""b2680b87ae1540268bb57bb1d2c584c7""public""0""public""42ce645284b84acc8ce8c6923910fe2a""0"4"0""A06_Specifications.pdf"164771"file"".pdf""1""2026-11-19T15:07:00.955+00:00""a929c0c43d894477bcc4c6b05e18790a""public""0""public""53597e26756144588d59679e18ebb0d3""0"3"0""B03_DBA_Wage_Determination.pdf"32496"file"".pdf""1""2026-11-19T15:07:00.955+00:00""cb76e956a5c34068aacf65fbfb102be1""public""0""public""26cd7b49f9a44a50b38d606c874e3ceb""0"2"0""Bid_Schedule.xlsx"113145"file"".xlsx""1""2026-11-19T15:07:00.955+00:00""fd66204d6b4e425e83148282b5336910""public""0""public""e7180ad7725c41388cbd699f7aaba208""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0836de25e51145789479be3c5015a6be), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.