**PROJECT DESCRIPTION: **
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
**SCOPE OF THE WORK: **
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
**ANTICIPATED SCHEDULE: **
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
**ESTIMATED COST RANGE: **
Between $2,000,000 and $5,000,000
The project covers approximately 1.3 miles from the Burro Creek bridge to the cattle guard near US Hwy 93, including full-depth reclamation and asphalt concrete paving with fog seals and tack coats, cross culverts and headwall reconstruction, ditch grading and reconditioning, berms, bank stabilization and riprap aprons, embankment benching, slope scaling and bridge approach repairs at the eastern abutment, plus regulatory and warning signs, pavement markings and boulder placement, with principal items including 1,600 tons of roadway aggregate, 2,000 LNFT of ditch reconditioning, 1.3 miles of full-depth reclamation, 3,600 tons of asphalt concrete pavement, 100 LNFT of 18-inch and 175 LNFT of 24-inch pipe culvert, and 100 boulders.
We post new asphalt opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""80228""LAKEWOOD""CO""USA""12300 W. DAKOTA AVE""AZ BL COLO 7528(1) IFB.pdf"2066234"file"".pdf""1""2026-10-15T19:09:32.533+00:00""5134b10429d649c2a21dddc767a1c2e5""public""0""public""003054595a114d01b3abdb32a189d2cf""0"18"0""AZ BL COLO 7528(1) Burro Creek Road_Plans.pdf"150572939"file"".pdf""1""2026-10-15T19:15:37.413+00:00""96748db757074358922b07a71e3b9954""public""0""public""4c1a93bf577d495598e19d3caac780ae""0"17"0""FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf"6020975"file"".pdf""1""2026-10-15T19:09:32.533+00:00""1d8671a5714f4ce8820f152d2fef3f3e""public""0""public""00ae733962b44bf3a36585d66a25a23c""0"16"0""AZ BL COLO 7528(1) Burro Creek Road JOFOC_Redacted.pdf"273681"file"".pdf""1""2026-10-15T19:09:32.533+00:00""4bd4865447084538a8761752e7755fc1""public""0""public""29c2f5c9792a4fa89b1e935db9cba74e""0"13"0""AZ BL COLO 7528(1) Burro Creek Road_FINAL HYD Report.pdf"37524346"file"".pdf""1""2026-10-15T19:09:32.533+00:00""f5e5d98b76bf432991a4240a73184ce6""public""0""public""2ca0fb80249c43baa53ae084c85d69a6""0"12"0""AZ BL COLO 7528(1) Burro Creek Road_FINAL GEO Report and FINAL PVMNT Report.pdf"21016792"file"".pdf""1""2026-10-15T19:09:32.533+00:00""508e848c83104959a4d12cb145bc7d47""public""0""public""6481f28a76f34af7888b66927933cb44""0"8"0""11.12.4 Design Physical Data and Reports.zip"71796"file"".zip""1""2026-10-15T19:09:32.533+00:00""e2da95ceab794ac585c74c98aa7423f1""public""0""public""2f3db617cc60448786f208589726e308""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 07013cf162754b15ba4b0f1b7d02d803), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.