This amendment is hereby executed to provide answers to questions from potential vendors.
The email address for the submission of proposals is changed from BunkersDDF@dla.mil to DDFBunkers@dla.mil.
Questions and Answers Posted Below:
//
1.Item 0026 – Singapore: Please confirm the correct delivery port/location, as Attachment A incorrectly references
South Korea.
Answer: Port of Singapore, Singapore.
2.Item 0012 – Lautoka, Fiji: Please confirm the minimum delivery quantity: 341 MT or 20 MT?
Answer: Minimum delivery quantity is 20 MT.
3.Item 0018 – Sattahip, Thailand: Please confirm the minimum delivery quantity: 100 MT or 20 MT?
Answer: Minimum delivery quantity is 20 MT.
4.Item 0011 – Laem Chabang, Thailand: Please confirm the minimum delivery quantity: 25 MT or 20 MT?
Answer: Minimum delivery quantity is 20 MT.
5.In Attachment A1 Schedule of Supplies, estimated quantities are indicated per line item number as a total quantity
within the contract term of 3 years. Is DLA able to provide an estimated annual volume lifting or a committed annual
volume range per year?
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because
the estimate was not met.
6.As some taxes/fees vary based on percentage, is Offeror able to submit a price for 2027 and indicative numbers for
the remainder of the term years to be revisited as the taxes/fees change?
Answer: No. Potential vendors shall submit one price. This price shall escalate according to the Platts escalator to
reflect market conditions.
7.Given Majuro’s planned implementation of a new tax system in January 2027, may the Offeror submit its initial bid
based on the current tax structure and revise its pricing once the new tax schedule in officially released?
Answer: No. Potential vendors shall submit one price. This awarded price shall escalate according to the Platts
escalator to reflect market conditions over the length of the contract period. A fixed-price contract with economic
price adjustment. After-imposed taxes may be covered under FAR 52.229-6.
8.In Attachment E, Delivery conditions 1.i, Offerors are required to provide “line handlers” for pipeline deliveries.
Please clarify the specific responsibilities and scope of this requirement.
Answer: Refers to personnel lifting the hose from the pipeline to the ship for delivery. This is part of the delivery
process.
9.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port?
Answer: All deliveries are at port side. No anchorage deliveries.
10.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate
offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker
barge/tanker, transit distance, travel time, and associated delivery costs.
Answer: All deliveries are at port side. No anchorage deliveries.
11.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA
provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the
approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier
in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability.
We understand that actual orders may vary and that any historical information would be for planning purposes only.
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because
the estimate was not met.
12.Alternative Delivery Methods: Is barge delivery strictly mandatory for CLINs designated as such, or would DLA consider alternative methods, including shore-based pipeline delivery, direct fueling from terminal facilities, or
truck-to-vessel bunkering while the receiving vessel is alongside a berth?
Answer: Alternate delivery methods can be submitted.
13.Operational Requirements: If alternative methods are permissible, would they need to meet specific pumping rates,
metering, hose, safety, or vessel-access requirements?
Answer: A pre-award survey shall determine if it is acceptable.
14.Technical Acceptability: Would a supplier proposing an alternative delivery method remain technically acceptable,
or would a formal solicitation amendment be required before such an offer could be considered?
Answer: Our DLA Energy Quality shall make that determination. A formal amendment shall not be issued before an award
is made on alternate delivery methods.
15.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port?
Answer: All deliveries are at port side. No anchorage deliveries.
16.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate
offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker
barge/tanker, transit distance, travel time, and associated delivery costs.
Answer: All deliveries are at port side. No anchorage deliveries.
17.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA
provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the
approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier
in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability.
We understand that actual orders may vary and that any historical information would be for planning purposes only.
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because
the estimate was not met.
18.Suva, Fiji – CLIN 0005
a.The listed delivery method is ex Barge. There are no barges in Suva and the preferred delivery method is Ex
Pipeline. Ex Truck is also available.
b.Can you adjust the requested delivery method accordingly?
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted
based on what is available at a location as an exception to what was originally solicited.
19.Lautoka, Fiji – CLIN 0012
a.The listed delivery method is ex Barge. There are no barges in Lautoka, the only delivery method is Ex Truck.
b.Can you adjust the requested delivery method accordingly?
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted
based on what is available at a location as an exception to what was originally solicited.
20.Koror, Palau – CLIN 0008
a.The listed delivery method is ex Barge. There are no barges in Palau and the preferred delivery method is Ex
Pipeline. Ex Truck is also available.
b.Can you adjust the requested delivery method accordingly?
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted
based on what is available at a location as an exception to what was originally solicited.
21.Are there any small business set-asides or preferences for this solicitation?
Answer: This solicitation is unrestricted. It is open to all business types. No set-asides.
End //
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"22060""FORT BELVOIR""VA""USA""INTOPLANE""8725 JOHN J. KINGMAN ROAD""SPE60827R0201 0003.pdf"15954"file"".pdf""1""2026-11-20T16:09:03.691+00:00""87d7f8f7a1324264923a206d075599fc""public""0""public""924288a345d94914a34a8c472058282e""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 059daf672c20491ab94da847d649d079), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.