The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD) on behalf of the National Park Service (NPS) intends to issue a solicitation to interested businesses with the capability to perform the work described below. Interested parties must maintain an active SAM registration. The procurement will be solicited on an unrestricted basis.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation ONLY. While the Government is not requesting proposals currently, a draft solicitation and pertinent attachments are attached for review and consideration.
Proposed Solicitation Issuance Date: On or around 11/30/2026 with Phase One submittals due within 15 days of issuance. See the draft solicitation for instructions and evaluation factors for Phase One.
This is currently an unfunded requirement with a high expectation that funds will be available.
Project Title: NAMA 326209 EAST POTOMAC SEAWALL DESIGN BUILD
Description:
NPS requires Design-Build (DB) services for the rehabilitation of approximately 20,700 linear feet of shoreline and seawall infrastructure at East Potomac Park in Washington, DC. The project area includes the shoreline along both the Potomac River and Washington Channel and encompasses associated improvements required to provide long-term shoreline protection, improve drainage performance, preserve public access and protect Park resources.
The Contractor shall develop rehabilitation alternatives for NPS evaluation and approval, and implement solutions that satisfy the following project objectives:
Type of Procurement:
Two-Phase Design-Build Selection Procedures (FAR 36.101-2 as deviated). The Government anticipates awarding one firm-fixed price contract for the design and construction services required. One solicitation will be issued with the Phase 1 and Phase 2 requirements. A draft solicitation is attached for review and consideration.
Estimated Price Range: More than $10,000,000.
Estimated Period of Performance: 51 months after award
The Contractor shall develop rehabilitation alternatives for NPS evaluation and approval, and implement solutions that satisfy project objectives including: rehabilitate or replace deteriorated shoreline protection infrastructure; restore shoreline functionality and reduce impacts associated with daily tidal cycles, minor storm events, erosion, debris loading, ice forces, and long-term settlement; evaluate and establish the appropriate historic functional height for shoreline segments; evaluate opportunities to accommodate future shoreline adaptation measures; reuse and repurpose existing seawall materials where feasible; maintain drainage and flood recovery performance; maintain, restore, and develop continuous public access to include ABA-compliant and universal access circulation routes; protect existing utilities and adjacent infrastructure; preserve historic, cultural, and environmental resources; and incorporate sustainable, durable, and low operations and maintenance solutions.
We post new excavating opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20170""HERNDON""VA""USA""381 ELDEN STREET""SUITE 4000""SOL_140D0427RP001_EPP_Seawall_DB_draft_1.pdf"1110591"file"".pdf""1""2026-11-13T14:14:10.342+00:00""c0ab568d031c4680ac297343b70c7ad7""public""0""public""72cb85bfd9db4f41b541dbed0298e915""0"3"0""Attachment_B_-_EPP_MAP_1.pdf"317844"file"".pdf""1""2026-11-13T14:14:10.342+00:00""52c096111c87422696ebd1c66f26fd16""public""0""public""d457ed79f75c47a68a629db8536057dd""0"2"0""Attachment_A_-_NAMA_326209_EPP_POR_093026_draft_1.pdf"20277"file"".pdf""1""2026-11-13T14:14:10.342+00:00""5f9ce485919d4ea297448444503e91e8""public""0""public""5d4b576bed5d485bbdcfbba176629614""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0583f871645a4c45a66a1e42d32902d8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.