We'll email you new electrical opportunities in Arizona as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Spacesaver and VIDIR Bed Lift Preventative Maintenance Services - SAVAHCS
The contractor shall provide all labor, materials, equipment, transportation, and supervision to perform two scheduled preventative maintenance visits per year (November and May) on 14 Spacesaver systems and 7 VIDIR bed lifts located in multiple buildings at the SAVAHCS campus. For Spacesaver systems, tasks include lubricating tracks, inspecting guide rollers and anti-tip features, checking carriage movement, chain tension, sprockets, handles/cranks, door and aisle lock operation, wiring/cable routing integrity, debris removal, floor condition, panel/shelving/cabinet fastening, and safety feature operation. For VIDIR bed lifts, tasks include removing beds, checking correct operation, chain tension adjustment and lubrication, safety feature operation, motor and motor mount inspection, wiring verification, ramp inspection, gearbox adjustment, hardware fastening, and wiping down the unit. Any identified deficiencies require a separate quote and purchase order before repair work is performed. The contractor must have factory-trained technicians and an on-site staff supervisor with OSHA 10 certification.
"US""90815""LONG BEACH""CA""USA""4811 AIRPORT PLAZA DRIVE""SUITE 600""S06 36C26227Q0005 0002 Amendment 2.pdf"324637"file"".pdf""1""2026-10-05T21:01:34.775+00:00""b8646d65bdcc47c3a1525835f0e86eb3""public""0""public""e5e22c20bf71436e905912723d3ab78c""0"6"0""36C26227Q0005_4.docx"25325"file"".docx""1""2026-10-05T21:01:34.775+00:00""b9b227eb771d49cbbfc13aec760d0dfc""public""0""public""43832681aaf74ec0ba1244927e39e9b9""0"5"0""S06 36C26227Q0005 0001 Amendment 1.pdf"189224"file"".pdf""1""2026-10-02T18:35:42.806+00:00""7bef9a7c7972425791b812ac103ca853""public""0""public""a4cfdeb83a2c4e44bdc4143d81774ce6""0"4"0""36C26227Q0005_3.docx"25333"file"".docx""1""2026-10-02T18:35:42.806+00:00""f982e4e34bae4f9eba130428793c71c6""public""0""public""f7e30e060cbf43258840f624e70f8e51""0"3"0""S02 36C26227Q0005_1.pdf"500901"file"".pdf""1""2026-09-22T17:07:18.26+00:00""3457e54b7c1547a982992772530ab13c""public""0""public""bd03c43dd67f49d6989197367016e174""0"2"0""36C26227Q0005_2.docx"23613"file"".docx""1""2026-09-22T17:07:18.26+00:00""7ec79b64dd0e46259f1bdd792d537e1a""public""0""public""3e3fab6e68234f84a2208a531e66ea5a""0"1"0"Most Arizona work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 047288969c6a467eb94470892ee9caf0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.