See attached for Solicitation Amendment SPRTA1-26-R-2101-0001.
The contractor shall manufacture and deliver new F-100 Duct, Fan, Aircraft G assemblies (NSN 2840-01-387-2657) in quantities ranging from a minimum of 7 to a maximum of 42 units, with a current required quantity of 28 units. The rear fan duct assembly ensures proper alignment and integration of rear fan and compressor stages into the engine airflow system. Manufacturing must comply with AMS 4928 and PWA-S-4928 Ti Alloy standards, ISO 9001-2015 quality standards, and higher-level contract quality requirements. Inspection and acceptance occur at origin. Contractor shall provide unique item identifiers (IUID) for traceability. Delivery is required by 31 December 2028 to DLA Distribution Depot Oklahoma, Tinker AFB OK, F.O.B. origin. The contractor shall mark for and ship to the designated location with proper packaging per AFMC 158 form specifications.
We post new goods & materials opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"73145-3070""TINKER AFB""OK""USA""DLR PROCUREMENT OPERATIONS (AO)""3001 STAFF DRIVE""SPRTA126R21010001.pdf"496376"file"".pdf""1""2026-11-04T16:59:03.384+00:00""888f555f2efe4fe2b0edce0dce26a2b4""public""0""public""69bb73c7c9c94590afe800d1459b3979""0"2"0""SPRTA126R2101.pdf"1687107"file"".pdf""1""2026-09-30T13:46:01.502+00:00""ab15d723ab1a4b8393e1476f92125034""public""0""public""f2d9c979459b4a9e9febaa498eabb715""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 0202b570e66842839140d8e9e8ffba48), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.