USCG STA PUGET SOUND (55107) FY27 DRYDOCK REPAIRS
Combined Synopsis/ Solicitation 70Z04026QSBPL0015, Specification package Rev-0, dated 13 MAY 2026, Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download.
The Period of Performance POP is 16 FEB 2027 TO 16 JULY 2027
The contractor must furnish all labor, material, services, equipment, supplies, power, accessories, and facilities (except as otherwise specified) to perform dry-docking repairs and alterations to the vessel. The work includes 40 definite contract line items covering general welding, hull plating inspection and ultrasonic testing, underwater appendage leak testing, accessible space inspection, mast inspection, main diesel engine alignment, exhaust muffler and piping cleaning and inspection, fuel valve renewal, ship service diesel generator cleaning and inspection, sea valve renewal, sea strainer overhaul, potable water tank cleaning and inspection, diesel tank refueling, buoy handling equipment renewal (excluding crane and deck winch renewal due to no GFP), rub rail/fendering system removal/inspection/installation, exterior buoy deck preservation, exterior deck non-skid broadcast grit system preservation, superstructure preservation (100%), interior hull insulation inspection, marine chemist services, drydocking, temporary services, sea trial performance support, underwater body preservation (100%), freeboard hull plating preservation (100%), MP fuel service tank cleaning and inspection, propeller shaft removal/inspection/installation, propeller removal/inspection/installation, standard hose renewal, rudder assembly removal/inspection/reinstallation, hull identification markings application, cathodic protection/zinc renewal, propeller shaft packing stuffing box removal/installation, propeller shaft packing renewal, water-lubricated shaft bearing renewal, compressed air receiver and system valve cleaning/inspection/hydro/lift, sewage holding tank cleaning and inspection, and grey water holding tank cleaning and inspection. The contractor must also provide a planning document with its proposal, deliver a GFP report, and quote a composite labor rate and laydays as optional items. The contractor's facility must have a minimum water depth of 7 feet and a minimum vertical clearance of 25 feet, with 2 additional feet below water depth at the pier.
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"55107 AMENDMENT A00001 QUESTIONS AND ANSWERS.pdf"181015"file"".pdf""1""2026-10-30T11:28:18.04+00:00""2316d97818af4d2587a896964f52d449""public""0""public""c30e1256e6fb4bbf9e03cc94e461ef3e""0"6"0""55107 Amendment 70Z04026QSBPL0015 A00001.pdf"182801"file"".pdf""1""2026-10-30T11:28:18.04+00:00""8287ba16a9d249dc9878845af929d609""public""0""public""5b39910bbeb243b885a8b89de4605d35""0"5"0""55107 SPEC.pdf"3171163"file"".pdf""1""2026-09-25T16:37:26.624+00:00""6b5e23463e0f47d4a31fb4bf1968f209""public""0""public""940d4f47fede438a8fb7806086775c98""0"4"0""555107- 70Z04026QSBPL0015_0_US.pdf"292690"file"".pdf""1""2026-09-25T16:37:26.624+00:00""c4b6b4a479c74b24b42bc04a3396318e""public""0""public""7a62ff4bdea5458f937a28fb2efdb651""0"3"0""55107 PPQ.pdf"168762"file"".pdf""1""2026-09-25T16:37:26.624+00:00""c1535c1acb2e4b3ba3838ea7f6b5d33f""public""0""public""ccaea681b7824bc6a2b503e891782930""0"2"0""55107-Schedule of Supplies and Services.pdf"93355"file"".pdf""1""2026-09-25T16:37:26.624+00:00""c14cf74f2e5e4139b9081e10933afa8b""public""0""public""4774bf107c724da59d78433822caa68e""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 02029d7fb0c9408da52df48ad45d1c7b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.