The purpose of this Amendment 0001 is to update Solicitation W912CH-26-B-0009 with the following:
SF 30:
Section A:
2. Bid opening will be moved from 23 September 2026 to 20 October 2026 at 1:30 P.M local time [Warren, MI]
*All other terms and conditions of the Solicitation remain unchanged and in full force and effect.
Invitation for Bids
First Ordering Year: 106 EA (Estimated)
Second Ordering Year: 125 EA (Estimated)
Third Ordering Year: 125 EA (Estimated)
Fourth Ordering Year: 125 EA (Estimated)
Fifth Ordering Year: 125 EA (Estimated)
Five-Year Minimum: 15 EA
Five-Year Maximum: 625 EA
Note: Only the five-year minimum quantity is guaranteed.
This procurement is being competed as FULL AND OPEN COMPETITION.
There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution statement "D", which limits access to Department of War (DoW) and U.S. DoW contractors only. Please see Section C.1 for instructions on how to access this technical data. Bidders must be granted TDP access prior to submitting a bid or the bid submission will be rejected.
Bidders are advised to carefully read and understand the entire IFB, including Sections L and M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions/negotiations and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.
Bidders must complete all necessary fill-ins and representations throughout the IFB. Failure to complete all required fill-ins and representations may result in the rejection of a bid.
Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If the IFB is amended, all terms and conditions not modified remain unchanged. Please see Section A.4 and RFO 52.214-3: Acknowledgement of Amendments for additional information.
All questions pertaining to the IFB shall be submitted via email to the following personnel by Wednesday, 09-OCT-2026 at 1:00 p.m. local time (Warren, MI):
** Martina R. Zook**
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: Martina.R.Zook.civ@army.mil
-and-
Kerri Ginter
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
EMAIL: kerri.e.ginter.civ@army.mil
Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see RFO 52.214-6: Explanation to Prospective Bidders for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date/time noted above, prior to IFB close.
The contractor will manufacture and deliver a Parts Kit, Hydraulic Pump (Part Number: 12284862) in accordance with the Technical Data Package (TDP). The contract includes five one-year ordering periods with estimated quantities of 106 units in the first year and 125 units per year thereafter, a five-year minimum of 15 units, and a five-year maximum of 625 units. Deliveries are FOB Destination to DLA Distribution Anniston in Anniston, AL. The contractor must comply with military preservation, packing, and marking per MIL-STD-2073-1 and Special Packaging Instruction AK10866793. The contract includes a First Article Test requirement (CLIN 0016) with a waiver option, and bidders must complete all required fill-ins and representations in the IFB.
We post new goods & materials opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"48397-5000""WARREN""MI""USA""KO DIRECTORATE OF CONTRACTING""6501 EAST 11 MILE ROAD""W912CH26B0009 AMD 0001.pdf"12377"file"".pdf""1""2026-09-17T20:05:19.524+00:00""bbc4a76a379c420f9622649c70d7c07c""public""0""public""82e64063b8b2438a987a0d28e8183a31""0"14"0""QA_Parts Kit Hydraulic Pump.xlsx"12568"file"".xlsx""1""2026-09-17T20:05:19.524+00:00""db67164c58eb4fa6a3f009275bba0e51""public""0""public""b7084ee9a0894229bb0c6d76ab012253""0"13"0""QA_Parts Kit Hydraulic Pump.xlsx"12566"file"".xlsx""1""2026-09-16T21:13:59.802+00:00""0a603202458b4973acd7d9f0cc1be17b""public""2026-09-17T20:05:19.524+00:00""1""public""29979bf4828043d59d60e63d1d41a463""0"12"0""2026-09-17T20:05:19.524+00:00""Technical Data Package TDP 1 of 2 Drawings.zip"174007561"file"".zip""1""2026-09-16T20:56:21.323+00:00""3b75e0f9b3404edcb6b21554038ce615""private""0""controlled""e2a6f952c4bf4ebb9f9f49be6aeb8df1""1"10"0""TDP 2 of 2 drawings.zip"240347396"file"".zip""1""2026-09-01T19:51:49.167+00:00""2656e9cbb1694897829e973bf9489bd6""private""0""controlled""05d628a283744e618f6bb0a65e358f64""1"6"0""First Article Waiver Worksheet.pdf"632395"file"".pdf""1""2026-08-19T00:54:08.286+00:00""d37695dbe8794c51afbe87764ab426bc""public""0""public""37cfe4f4777f4451895028f4801304e2""0"3"0""SPECIAL PACKAGING INSTRUCTIONS SPI AK10866793.pdf"290615"file"".pdf""1""2026-08-19T00:54:08.286+00:00""e63d2e2b5ba54ba0b7bc52fecc6df939""private""0""controlled""926d4530a29b49b39a3ef032784800a0""1"2"0""W912CH26B0009.pdf"194893"file"".pdf""1""2026-08-19T00:54:08.286+00:00""5e03baae3f0e4b5d8efd6720ee41b7c2""public""0""public""9b47b67367f446eba2b1577618df42b2""0"1"0"Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously — and the most common thing Propeller is asked for.
Source: SAM.gov (notice 004340674cbf4466bb19f9bd6773bbfe), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.