Snohomish erosion control bonds.
From $125.

Snohomish County conditions land-disturbing and grading permits on an erosion control performance bond that guarantees you install and maintain erosion and sediment controls. The County sets the amount — pricing is 3% of the bond amount plus a $25 fee, $125 minimum, assessed via one soft credit pull that never affects your score.

Required by Snohomish County for erosion and sediment control — a condition of your land-disturbing or grading permit
Amount is set by the County — sized to the cost of the erosion-control measures
Pricing starts 3% of the bond amount + $25 fee — $125 minimum, assessed via a soft credit pull that never affects your score; your exact price appears at the application
A-ratedA.M. Best carriersSoft pullnever affects your scoreFrom $1253% of the bond amount + $25 fee
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Three steps to filed.

Your permit is waiting on this bond. Here is the entire process — no broker phone tag:

TODAY · ONLINE

Apply once, online

Business details, the bond amount the County required, and the effective date — plus a one-time consent to a soft credit pull.

WITHIN 48 HOURS

Reviewed & approved

Most of these clear quickly; if underwriting needs anything, you hear from an underwriter within 48 hours. The credit check is a soft pull that never affects your score; your price is set by the 3% + $25 fee formula, $125 minimum.

1–2 BUSINESS DAYS

E-sign & file with the County

Pay online and receive the executed bond, ready to file with Snohomish County Public Works. Wet-ink originals mailed whenever the County insists.

About this bond

What it is and who needs it.

What the erosion control bond actually guarantees

Snohomish County regulates land disturbance, grading, and clearing through Public Works and conditions those permits on an erosion control performance bond. The bond is a completion-and-maintenance guarantee: it stands behind your obligation to install and maintain erosion and sediment controls so soil does not wash off your site into County drainage and waterways.

If you fail to keep the controls in place — or to remove and stabilize the site when the work is done — the County can draw on the bond to do it. It protects County drainage infrastructure and downstream water quality from the consequences of an unstabilized site.

It is not insurance for you — if the surety pays the County, you repay the surety. This bond carries a one-time soft credit pull, which never affects your score and informs pricing and approval. Pricing is 3% of the bond amount plus a $25 fee, with a $125 minimum.

Snohomish County Public WorksSnohomish County requires this bond as a condition of a land-disturbing, grading, or clearing permit administered by Snohomish County Public Works; the bond amount and terms are set by the County and tied to the cost of the erosion and sediment control measures. Snohomish County administers land disturbance and drainage under its County Code — confirm the exact bond amount on your permit.

You need this bond if you are

A grading or site contractor disturbing land in unincorporated Snohomish County
A developer whose project requires erosion and sediment controls
Clearing or filling a site under a County land-disturbing permit
Renewing or extending a permit the County ties to a continuing erosion bond

One application, issued instantly.

These are the actual underwriting fields, including a one-time consent to a soft credit pull. Submit once and your bond is typically issued within 1–2 business days.

Start the application →
FAQ

Common questions.

How much is the Snohomish County erosion control bond?Pricing is 3% of the bond amount plus a $25 fee Snohomish County sets, tied to the cost of the erosion-control work, plus a $25 fee, with a $125 minimum.
Who requires this bond?Snohomish County, through Snohomish County Public Works, as a condition of a land-disturbing, grading, or clearing permit.
Is there a credit check?Yes — one soft credit pull, which never affects your score. It supports underwriting approval; your exact price is 3% of the bond amount plus a $25 fee, $125 minimum.
What does the bond guarantee?That you install and maintain erosion and sediment controls and stabilize the site. If you do not and the County has to act, it can recover against the bond — and if the surety pays, you repay the surety.
What amount should I enter?Use the figure on your County permit. If you don't have it yet, send us the permit and we'll confirm the amount before you buy.
Related bonds

Other Washington bonds.

The County is waiting on one document.

Pricing of 3% of the bond amount plus a $25 fee ($125 minimum), soft pull only. Enter the County amount and e-sign in 1–2 business days.

Your premiumfrom $125
Apply now →