Beaverton right-of-way bonds.
From $125.
Beaverton Code 9.05.020 requires a permit from the City Engineer for work in a City of Beaverton right-of-way, and BC 9.05.070 requires you to post security for performance: a bond or other security, in a form the City Attorney approves, satisfactory to the City Engineer. Premiums cost 1% of the bond amount plus a $25 fee, $125 minimum.
Trusted by industry leaders
















How much does a Beaverton right-of-way bond cost?
1% of the bond amount plus a $25 fee, from $125. Enter your amount in the calculator for the exact price.
Three steps. One sitting.
No long underwriting queue for the standard right-of-way security — enter your amount, pay, and file with the City Engineer. Here is the whole thing:
Apply online
Your details, the work described on your right-of-way permit application, and the bond amount the City Engineer set.
Approved
No credit check up to $100,000. Larger amounts may get a brief review before your 1%-of-amount premium, $125 minimum, is finalized.
File with the City Engineer
Your executed bond and power of attorney arrive by email, ready to attach to your right-of-way permit application. Wet-ink originals mailed on request.
What it is and who needs it.
What the Beaverton right-of-way bond actually guarantees
Beaverton's public rights-of-way — its streets, sidewalks, curbs, gutters, and utility corridors — belong to the city and its residents. BC 9.05.020 bars anyone from performing work, development, excavation, or fill, or from altering streets, sidewalks, curbs, gutters, or utilities, or tampering with pavement inside a right-of-way, easement, or other city property without a permit from the City Engineer first.
The bond required by BC 9.05.070 is performance security: it names the City of Beaverton as obligee and backs your promise to complete the permitted work — driveway cuts, utility trenching, road boring, sidewalk repair, and similar private work in the right-of-way — the way the permit describes it, within the time the City Engineer sets, and to restore the public area to its original condition. If the work is left unfinished or the right-of-way is damaged and not repaired, the city can draw on the bond to complete or correct it.
The code sizes the security to the City Engineer's estimate of the cost of the development the permit governs — there is no single flat dollar figure across every permit. Once your work is substantially complete, a separate, smaller maintenance security may also apply. Enter the bond amount your permit requires; we price it from a $125 minimum, and no credit check up to $100,000.
You need this bond if you are
Claims, renewal, filing, and what sets the price.
If a claim is made
A claim comes from the party the bond protects, the obligee named on the form, when the duty the bond guarantees is not met.
The surety investigates and pays a valid claim, up to the bond amount. You then repay the surety: a surety bond is a guarantee of your performance, not insurance for you.
Renewal and term
The premium covers a one-year term from the effective date you choose.
Renew before the expiry date to keep the bond in force: the license, permit or contract it backs expects continuous coverage.
How to file it
File with the City Engineer. Your executed bond and power of attorney arrive by email, ready to attach to your right-of-way permit application. Wet-ink originals mailed on request.
What sets the price
The premium is 1% of the bond amount plus a $25 fee, $125 minimum: the amount the obligee sets moves the price, not your business profile.
No credit check up to $100,000. Above that, the carrier may run a soft pull, which never affects your score.
Where a check runs, it decides approval; the rate is the same for everyone approved.
One application, no credit check up to $100,000.
Submit the application with the work described on your right-of-way permit and the bond amount the City Engineer set. No credit check up to $100,000.
Start the application →Common questions.
Other Oregon bonds.
Price and requirements checked on the carrier’s application, . Page updated .
Right-of-way permit waiting on one bond.
Premiums from $125. Enter the amount the City Engineer set and attach it to your permit application today.
