Portage County road bonds.
Flat 3%. Enter your amount.

Portage County requires a road bond before you open, cut, or work within a county road or right-of-way — utility crossings, driveway tie-ins, excavation. The bond backs restoring the road; the Portage County Engineer sets the amount, and we issue it at a flat 3% with no credit check.

Required by Portage County before you open or work in a county road or right-of-way
Backs proper restoration of the road, berm, and right-of-way you disturb
Flat 3%, no credit pull — enter the amount the County required and the premium updates
Flat 3%of your bond amount$275minimum premiumNo creditcheck to issue
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

No underwriting queue for the standard road bond — enter your amount, pay, and file with the County. Here is the whole thing:

TODAY · 5 MINUTES

Apply online

Your business details, the bond amount the County required, and the effective date — that is the entire application.

INSTANTLY

Issued on the spot

No credit check and no waiting — the executed bond is generated as soon as you pay. Larger amounts may get a quick review.

SAME DAY

File with Portage County

Submit the executed bond with your road opening or right-of-way permit to the Portage County Engineer. Wet-ink originals mailed on request.

The whole pricing page.

Bond amount × 3% = your premium, one-time, $275 minimum. Enter the figure Portage County required and the premium updates.

$5,000 bond
$275
$10,000 bond
$300
$25,000 bond
$750
About this bond

What it is and who needs it.

What the road bond actually covers

Portage County, through its County Engineer, requires a road bond before anyone opens, cuts, bores under, or otherwise works within a county road or right-of-way — for utility crossings, driveway connections, drainage, and excavation.

The bond is a restoration guarantee: it backs your promise to backfill and compact trenches, repave or patch the road surface, restore the berm and drainage, and leave the right-of-way in as-good-or-better condition. If you leave a settled trench or a damaged road, the County can recover against the bond to fix it.

It is a three-party guarantee — you (the principal), the surety carrier, and Portage County (the obligee). It is not insurance for you; if the surety pays a claim, you repay the surety.

Portage County Engineer (road / right-of-way permit)Portage County, Ohio requires this bond through the County Engineer before opening or working within a county road or right-of-way; the bond amount and conditions are set by the County on the permit. We issue the amount the County names — confirm the figure on your permit paperwork and we will match it.

You need this bond if you are

A utility or excavation contractor opening a Portage County road for a crossing or tie-in
Installing a driveway or culvert that connects to a county road
Boring or trenching under or along a Portage County right-of-way
A developer or site contractor the County Engineer requires to bond road work

Five minutes, issued on the spot.

Submit the application with the bond amount the County set — the executed bond is generated instantly, ready to file with your permit.

Start the application →
FAQs

Common questions.

If yours isn't here, the bond team can usually answer within the hour.

How much is the Portage County road bond? +
The premium is a flat 3% of the bond amount, with a $275 minimum. The amount itself is set by the Portage County Engineer on your road opening or right-of-way permit. Enter that figure and the quote updates.
Who requires this bond? +
Portage County, through its County Engineer, as a condition of opening or working within a county road or right-of-way. No active bond, no permit.
What does the bond guarantee? +
That you restore the road and right-of-way you disturb — backfilling trenches, repaving, and fixing drainage. If you fail to and the County is harmed, it can claim against the bond, and if the surety pays, you repay the surety.
Is there a credit check? +
No — this bond is issued with no credit pull. Larger bond amounts may get a quick soft-pull review, which never affects your credit score.
What amount should I enter if I'm not sure? +
Use the figure the Portage County Engineer set on your permit. If it is not listed yet, ask the County for the required amount and we will issue exactly that.
Related bonds

Other New York bonds.

Road bond, issued today.

Five-minute application, flat 3%, $275 minimum. Enter the amount Portage County required and file the same day.

Your premium @ 3%$300
Apply now →