Montgomery right-of-way bonds.
Flat 3%. Enter your amount.

The City of Montgomery requires a right-of-way bond before you open, cut, or work in the public right-of-way under a city permit. The city sets the amount on your permit — and we issue it at a flat 3% with no credit check. Enter the required figure and the premium updates.

Required by the City of Montgomery for right-of-way permit work — excavation, utility, and street cuts
Amount set by the city — sized to the scope of your right-of-way work on the permit
Flat 3%, no credit pull — enter your required amount and the premium updates
Flat 3%of your bond amount$275minimum premiumNo creditcheck to issue
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

No underwriting queue for the standard right-of-way bond — enter your amount, pay, and file with the City of Montgomery. Here is the whole thing:

TODAY · 5 MINUTES

Apply online

Your business details, the bond amount the city required, and the effective date — that is the entire application.

INSTANTLY

Issued on the spot

No credit check and no waiting — the executed bond is generated as soon as you pay. Larger amounts may get a quick review.

SAME DAY

File with the City of Montgomery

Submit the executed bond with your right-of-way permit application to the City of Montgomery. Wet-ink originals mailed whenever the office insists.

The whole pricing page.

Bond amount × 3% = your premium, one-time, $275 minimum. Enter the figure on your City of Montgomery permit and the premium updates.

$5,000 bond
$275
$10,000 bond
$300
$25,000 bond
$750
About this bond

What it is and who needs it.

What the right-of-way bond actually covers

When you open, cut, bore, or excavate in the City of Montgomery's public right-of-way — for a utility connection, driveway approach, or street cut — the city issues a right-of-way permit and conditions it on a surety bond. The bond is a public-infrastructure guarantee: it stands behind you restoring the street, curb, and right-of-way to the city's standards.

It's a three-party arrangement: you (the principal), the surety carrier standing behind you, and the City of Montgomery (the obligee), with the public as the protected party. If a permittee damages the right-of-way, leaves a defective restoration, or fails to backfill and repave properly, the city can recover against the bond.

Because the amount is set per permit by the scope of work, there is no single statutory figure — you enter whatever the City of Montgomery named on your permit, and we issue the bond at a flat 3% with no credit check.

City of Montgomery right-of-way permitThe City of Montgomery, Ohio requires this bond as a condition of its right-of-way / street-opening permit; the bond amount and terms are set by the City of Montgomery (Public Works/Engineering Department) based on the scope of your work. Confirm the required amount on your permit before filing.

You need this bond if you are

A utility or excavation contractor opening the City of Montgomery right-of-way
Cutting or boring a city street under a Montgomery right-of-way permit
Connecting to public utilities that the city requires a right-of-way bond for
A developer or builder whose Montgomery permit conditions work on a bond

Five minutes, issued on the spot.

Submit the application with the bond amount the City of Montgomery set — the executed bond is generated instantly, ready to file with your right-of-way permit.

Start the application →
FAQs

Common questions.

If yours isn't here, the bond team can usually answer within the hour.

How much is the City of Montgomery right-of-way bond? +
The premium is a flat 3% of the bond amount, with a $275 minimum. The amount itself is set by the City of Montgomery on your right-of-way permit, sized to the scope of your work. Enter the figure on your permit and the quote updates.
Do I always need this bond? +
You need it when the City of Montgomery requires a right-of-way / street-opening permit for your work — typically excavation, utility connections, boring, and street cuts in the public right-of-way. Confirm with the city's Public Works/Engineering Department.
Is there a credit check? +
No — the right-of-way bond is issued with no credit pull. Larger bond amounts may get a quick soft-pull review, which never affects your credit score.
What does the bond protect against? +
It protects the City of Montgomery and the public if you damage the right-of-way or fail to restore the street, curb, and surface to the city's standards. If a valid claim is paid, you repay the surety — it is not insurance for you.
What amount should I enter if I'm not sure? +
Use the figure on your City of Montgomery right-of-way permit — the city sets it per project. If the permit hasn't named an amount yet, ask the Public Works/Engineering Department and we'll issue to match.
Related bonds

Other New York bonds.

Right-of-way bond, issued today.

Five-minute application, flat 3%, $275 minimum. Enter the amount the City of Montgomery required and file the same day.

Your premium @ 3%$300
Apply now →