The Township of Bridgewater, NJ requires a revegetation and stabilization bond on a soil-movement permit — it guarantees you stabilize and revegetate the disturbed soil so the site doesn’t erode after the earthwork. The Township sets the amount; we issue it at a flat 3%, $275 minimum, with one soft credit pull.
















Enter the amount the Township required, consent to one soft credit pull, and file with Bridgewater. Here is the whole thing:
Your business details, the bond amount on your Bridgewater permit, and the effective date — plus a one-time consent to a soft credit pull.
The soft credit pull never affects your score and informs approval, not price. Most clear quickly; an underwriter follows up within 48 hours if anything is needed.
Submit the executed bond to the Township of Bridgewater to satisfy your soil-movement permit. Wet-ink original mailed on request.
Bond amount × 3% = your premium, one-time, $275 minimum. A soft credit pull affects approval, never the price. Enter the figure on your Bridgewater permit.
When you move soil in Bridgewater, the bare ground you leave behind can erode into streets, storm drains, and neighboring property. A revegetation and stabilization bond guarantees you put the site back together — stabilizing slopes and re-establishing vegetation so the disturbed soil stays put.
It's a three-party arrangement: you (the principal), the surety carrier, and the Township of Bridgewater (the obligee). If you leave the soil exposed or fail to revegetate, the Township can recover against the bond to complete the stabilization work.
The Township sets the amount on your soil-movement permit, usually tied to the volume disturbed and the area to be revegetated. We issue that amount at a flat 3%, $275 minimum, with one soft credit pull that never affects your score.
These are the actual underwriting fields, including a one-time consent to a soft credit pull. Submit once and your bond is typically issued within 1–2 business days.
Start the application →If yours isn't here, the bond team can usually answer within the hour.
Five-minute application, flat 3%, $275 minimum, soft pull only. Enter the amount the Township required and file when issued.