Atlantic County highway occupancy bonds.
From $100.
Atlantic County (the County, not Atlantic City) requires a performance and maintenance guarantee with every highway occupancy permit on a county road. Schedule B of County Code Chapter 72 sets the amount by type of work, and above $2,000 a certified check is no longer an option. Premiums cost 2% of the bond amount, $100 minimum.
Trusted by industry leaders
















How much does an Atlantic County highway occupancy bond cost?
2% of the bond amount, from $100 at the $750 minimum. Enter your amount in the calculator for the exact price.
Apply to filed in one sitting.
No underwriting queue for a standard permit bond. Have your permit application in front of you, apply, pay, and send the bond to the Division of Engineering. Here is the whole thing:
Apply online
Your business details, the bond amount, and the effective date, plus the permit number, purpose of work, county road number and county road name from your highway occupancy permit application.
Pay & e-sign
Standard applications approve instantly, and the executed bond and power of attorney generate as soon as you pay.
File with the Division of Engineering
Send the bond with your permit application to the Atlantic County Division of Engineering in Northfield. The bond must be in a form acceptable to County Counsel; a wet-ink original is mailed if the County asks for one.
What it is and who needs it.
What the Atlantic County highway occupancy bond guarantees
Atlantic County regulates work in its road rights-of-way through County Code Chapter 72, Right-Of-Way Use and Occupancy Standards, Permits and Prohibited Acts, adopted by the Board of County Commissioners on September 5, 2023 (Ord. No. 10-2023). Anyone opening, boring under or building in a county road needs a highway occupancy permit from the County Engineer, and § 72-8 makes every permittee provide a performance guarantee naming the County as beneficiary, in a form acceptable to County Counsel. The Engineer’s Office will not treat an application as complete, or begin processing it, until the fee, bond, insurance, plan and traffic control plan are all in.
The amount comes from Schedule B, attached to the chapter, and the County Engineer may adjust it. A longitudinal trench opening up to 200 square feet is $4,200 in the paving or $750 outside it, plus $12 or $2 for each additional square foot; jack and boring is printed as “$1,500 + 30 per linear foot” (no dollar sign appears before the 30, so confirm the unit with the Division); road widening up to 50 square yards is $3,600, plus $35 for each additional square yard; test holes, soil borings and monitoring wells in the paving are $1,500 a unit; drainage and sewerage facilities $2,000; curb and gutter $1,200 to $2,000, plus $1,000 for each further 100 linear feet; a commercial driveway $1,500 or $2,000. Residential driveways, temporary construction access and sidewalks need no surety, and a bridge attachment is set from the Engineer’s cost estimate.
The guarantee runs in two stages. The performance side secures the work and the restoration of the road. When the County Engineer accepts the work, you deliver a maintenance bond, as a new instrument or an amendment to the performance guarantee, that stays in force for two years after the final pavement surface or other permanent top is applied and approved. § 72-8(D)(2) says the performance and maintenance bond is issued by a surety bonding company authorized to do business in New Jersey, with a certified check allowed “if the bond amount is $2,000 or less”; § 72-8(A) allows the check “if the amount is less than $2,000”. If you are at exactly $2,000, ask the Division which wording it applies.
Public utilities may rely on an annual $50,000 blanket bond for routine and emergency work while each job needs less than $10,000 in bonding and outstanding permit work stays under $100,000 (§ 72-8(B)). Work already covered by a guarantee posted under a Chapter 86 site plan or subdivision approval can rely on that guarantee (§ 72-8(C)). This is the County’s bond, unlike the Ocean, Burlington or Union County road-opening bonds and unlike the City of Atlantic City’s sidewalk permit bond. It is not insurance for you: if the surety pays the County, you repay the surety.
You need this bond if you are
Claims, renewal, filing, and what sets the price.
If a claim is made
A claim comes from the party the bond protects, the obligee named on the form, when the duty the bond guarantees is not met.
The surety investigates and pays a valid claim, up to the bond amount. You then repay the surety: a surety bond is a guarantee of your performance, not insurance for you.
Renewal and term
The premium covers a one-year term from the effective date you choose; a longer term is the same price per year, chosen at checkout.
Renew before the expiry date to keep the bond in force: the license, permit or contract it backs expects continuous coverage.
How to file it
File with the Division of Engineering. Send the bond with your permit application to the Atlantic County Division of Engineering in Northfield. The bond must be in a form acceptable to County Counsel; a wet-ink original is mailed if the County asks for one.
What sets the price
The premium is 2% of the bond amount, $100 minimum: the amount the obligee sets moves the price, not your business profile.
No credit check up to $10,000. Above that, the carrier may run a soft pull, which never affects your score.
Where a check runs, it decides approval; the rate is the same for everyone approved.
One application, issued instantly.
These are the actual issuing fields. Have your permit number, purpose of work and county road number and name ready, and enter the Schedule B amount.
Start the application →Common questions.
Other New Jersey bonds.
Price and requirements checked on the carrier’s application, .
Atlantic County permit, bonded today.
Enter the Schedule B amount, pay, and file with the Division of Engineering. Free until issued.