Lake County highway right-of-way bonds.
From $100. Enter your amount.

Under Lake County's Highway Access and Use Ordinance, the Lake County Division of Transportation (LCDOT) requires a performance guarantee, payable to the County, before it issues a permit to place or relocate a facility — a sidewalk, sewer line, street lighting, driveway, or similar improvement — within a county highway right-of-way. The guarantee is released once LCDOT accepts the completed, permitted work. Premiums cost 1% of the bond amount, $100 minimum; the application collects no credit information.

Required under Lake County's Highway Access and Use Ordinance, administered by LCDOT
Bond amount is set by LCDOT with your access or facility permit, sized to the scope of the work
From $100, no credit section in the application — enter the amount your permit requires
From $1001% of the bond amount, $100 minimumNo credit fieldsin the applicationFastinstant underwriting for most
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

Enter the amount LCDOT specified on your permit, pay, and file. Here is the whole thing:

TODAY · ONLINE

Apply online

Your firm or ownership details, the location and description of the facility or access work, the bond amount your LCDOT permit requires, and the effective date.

USUALLY MINUTES

Approved

The application collects no credit information, and most applications approve instantly. Pricing is 1% of the bond amount, $100 minimum.

SAME DAY

File with LCDOT

Your executed bond arrives by email, ready to file with the Lake County Division of Transportation so your access or facility permit can be issued.

About this bond

What it is and who needs it.

What the Lake County right-of-way performance bond actually guarantees

Lake County's Highway Access and Use Ordinance governs work within a county highway right-of-way, and the Lake County Division of Transportation (LCDOT) requires a permit — plus a performance guarantee, payable to the County — before it authorizes placing or relocating a facility such as a sidewalk, sewer line, street lighting, driveway, or trees inside that right-of-way.

It's a three-party arrangement: you (the principal), the surety carrier, and Lake County (the obligee), with the traveling public and the county's road infrastructure as the protected party. The guarantee backs your promise to complete the permitted work to LCDOT's specifications; LCDOT releases it once the agency accepts the finished, permitted work — a letter of credit or cash guarantee can serve the same role.

Because LCDOT sizes the guarantee to each access or facility permit's scope, there is no single fixed amount — enter the figure your permit specifies, and we price it from a $100 minimum. It is not insurance for you — if the surety pays a claim, you repay the surety.

Lake County Highway Access and Use Ordinance — Division of TransportationThe Lake County Division of Transportation administers permits for placing or relocating facilities within county highway rights-of-way under the Lake County Highway Access and Use Ordinance. A permittee furnishes a performance guarantee — a surety bond, letter of credit, or cash — payable to the County, sized to the scope of the permitted work; LCDOT releases the guarantee upon acceptance of the completed work. Confirm your required amount with LCDOT before you apply.

You need this bond if you are

A utility company or contractor placing or relocating a facility within a Lake County highway right-of-way
A developer whose site plan requires a driveway, sidewalk, or drainage connection to a county highway
Applying for an LCDOT access or facility permit — the guarantee is filed with the permit application
Replacing a letter of credit or cash guarantee with a lower-cost surety bond

One application, issued instantly.

These are the actual issuing fields — no credit section, because this bond doesn't collect credit information.

Start the application →
FAQ

Common questions.

How much is the Lake County highway right-of-way performance bond?Premiums cost 1% of the bond amount, with a $100 minimum. The amount itself is set by LCDOT based on the scope of your access or facility permit — your exact price appears at the application.
What amount should I enter?Use the figure LCDOT specified on your access or facility permit under the Highway Access and Use Ordinance. Check your permit paperwork or ask LCDOT to confirm before you apply.
What does the bond guarantee?It guarantees you'll complete your permitted facility or access work to LCDOT's specifications. LCDOT releases the guarantee once it accepts the finished work. It is not insurance for you; if the surety pays a claim, you repay the surety.
Where do I file it?With the Lake County Division of Transportation, alongside your access or facility permit application. Your e-signed bond arrives by email, ready to file.
Is there a credit check?The application collects no credit information, and most applications approve instantly. If a check ever runs, it's a soft pull that never affects your score.
Related bonds

Other Illinois bonds.

Get your right-of-way permit bond filed today.

From $100, soft pull only, bond often issued in the same sitting. Free until issued.

Your premiumfrom $100
Apply now →