Edwardsville right-of-way bonds.
From $100. Enter your amount.

The City of Edwardsville Public Works Department requires a bond before you excavate, install, or otherwise work within the public right-of-way — filed alongside your right-of-way excavation or driveway permit. Premiums cost 1% of the bond amount, $100 minimum, and the application collects no credit information.

Required before excavating or working in the Edwardsville public right-of-way — driveway cuts, utility taps, and similar work
Bond amount set by the Public Works Department for the scope of your project
1% of the bond amount, $100 minimum — no credit section, exact price at the application
1% rate$100 minimumExactprice at the applicationSoft pull onlynever a hard inquiry
Trusted by industry leaders
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
NYCEDC
BDG
Capital
McKinney
Terra
JLL
Triple Five
Georgetown
How it works

Apply to filed in one sitting.

The right-of-way bond pairs with your excavation or driveway permit application. Here is the whole thing:

TODAY · ONLINE

Apply online

Your business details, the bond amount your permit requires, and the effective date — that is the entire application.

INSTANTLY

Issued on the spot

The application collects no credit information, so most bonds generate the moment you pay. Larger amounts may get a quick soft-pull review that never affects your score.

SAME DAY

File with Public Works

Submit the executed bond with your right-of-way excavation or driveway permit application. Wet-ink originals mailed whenever the City insists.

About this bond

What it is and who needs it.

What the right-of-way bond covers

Edwardsville's Public Works Department requires a bond before work is performed in the public right-of-way — the streets, alleys, and easements the City maintains. The bond stands behind the applicant's compliance with the City's excavation standards and the restoration of any public way disturbed by the work.

It is a three-party arrangement: you (the principal), the surety carrier, and the City of Edwardsville (the obligee). If the work is not performed to standard or leaves the right-of-way un-restored, the City can look to the bond to complete or correct the work.

It is not insurance for you — if the surety pays a claim, you repay the surety. Edwardsville separately bonds excavations tied to sewer installation at a higher figure; if your project involves a sewer tap, confirm with Public Works which filing applies to your specific work.

City of Edwardsville Public Works DepartmentPublic Works administers the right-of-way excavation and driveway permit for the City of Edwardsville. A specific municipal code section number and general bond amount for this permit were not independently verifiable at publication; confirm your required bond amount directly with the Public Works Department (618-692-7535) before filing.

You need this bond if you're

Excavating in an Edwardsville street, alley, or easement for a utility tap, driveway, or similar cut
A contractor performing work in the public right-of-way on behalf of a property owner or developer
Installing a new driveway approach that crosses the public right-of-way
Filing a new right-of-way excavation or driveway permit with Public Works

One application, issued on the spot.

These are the actual issuing fields — no credit section, because this application doesn't collect credit information.

Start the application →
FAQ

Common questions.

What amount should I enter for the Edwardsville right-of-way bond?Public Works sets the amount based on the scope of the excavation or driveway work covered by your permit. Confirm the figure with Public Works, then enter it here — your exact premium is priced at application.
What does the bond guarantee?It stands behind your compliance with the City's excavation standards and the restoration of the public right-of-way once your work is done. It protects the City and the public way, not you.
Where do I file it?With the City of Edwardsville Public Works Department, alongside your right-of-way excavation or driveway permit application.
Do I pay the full bond amount?No. The bond amount is the surety's maximum liability if a valid claim is made — not a deposit. You pay the premium: 1% of the bond amount, $100 minimum, shown at the application before you pay.
Is there a credit check?The application collects no credit information, so most applicants approve instantly. If a check ever runs on this bond, it's a soft pull that won't affect your score.
Related bonds

Other Illinois bonds.

File your Edwardsville right-of-way permit today.

From $100, with your exact price at the application. Enter your amount and file the same day.

Your premiumfrom $100
Apply now →