Generate a quick AI overview of this bid, pulled from its details and the attached documents.
The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.
Source: SAM.gov (notice fdf88e9ccd784eb884c6465c589dca2d), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →