1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
Onboarding Opportunity 1:
Whitepapers Due: Closed
Mandatory Site Visit Window: Completed
Consortium Activation Date: 1 July 2026
Onboarding Opportunity 2:
Whitepapers Due: Closed
Mandatory Site Visit Window: Complete
Onboarding Opportunity 3:
Whitepapers Due: TBD
Mandatory Site Visit Window: TBD
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
Atch 3 - CMMC-Information.pdf
Atch 4 - CMMC-FAQsv6.pdf
Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
15 Oct 26: AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf posted and will be the basis for evaluating onboarding 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf was updated by adding the Performer Representation article.
The Alliance will execute sustainment, restoration and modernization of test infrastructure including general and industrial construction, low-pressure, high-pressure and hazardous process piping systems, large-diameter process ducting, high-voltage, medium-voltage and low-voltage electrical systems, specialized fire suppression, overhaul of major rotating equipment, mechanical, electrical and ID&C engineering services, site-wide utilities, and solid rocket motors and components work at Arnold Air Force Base, Tennessee, Holloman Air Force Base, New Mexico, Tunnel 9, Maryland, NFAC, California and other Air Force Test Center locations.
We post new uncategorized opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37389-1332""ARNOLD AFB""TN""USA""CP 931 454 7841""100 KINDEL DR STE A332""AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf"430697"file"".pdf""1""2026-10-15T15:48:00.579+00:00""e45535100a68498997c0d2d1c4eb6975""public""0""public""67621f7935a94009a6c458e844b661ee""0"49"0""Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf"413899"file"".pdf""1""2026-10-15T15:48:00.579+00:00""7f5481ee2eab4adf8c54b507919208e1""public""0""public""74dd73edad6e47d7826b3892a006cb3c""0"48"0""AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf"475788"file"".pdf""1""2026-08-31T17:52:07.33+00:00""754af576f78a43ac9face88cdf7dd3ad""public""0""public""fb18257053934ec19751880142d70530""0"46"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf"156147"file"".pdf""1""2026-08-26T20:46:46.933+00:00""dbe506fb16b245f5a557fe3fb6cf2e3a""public""0""public""29c016b1a4e448589d780bb527a1e058""0"45"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf"512332"file"".pdf""1""2026-08-26T20:46:46.933+00:00""2a85223df27b4733a59684d16bca3a13""public""0""public""f0ac668680f64bee942adffb4eb5e417""0"44"0""AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf"472240"file"".pdf""1""2026-07-17T19:49:28.02+00:00""b1fe383eb61748cb9b132e5d6b5673ae""public""0""public""a3ecc15e438f46d2aac641418cd553c7""0"43"0""Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf"401766"file"".pdf""1""2026-07-17T13:26:25.591+00:00""8735301ec55b4dae8b81f62bb6dc8242""public""0""public""4eb1f1b601b14cea93f0f89114f6f7e9""0"42"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf"510320"file"".pdf""1""2026-07-17T13:26:25.591+00:00""9dfb5f912bae4708a2d8685cacefd7c2""public""0""public""a2aa2dac606b4dacb7012480c343ae1f""0"41"0""Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf"464704"file"".pdf""1""2026-07-15T19:20:40.262+00:00""30ce66a2c8dc4806b53e1c1583cccfd0""public""0""public""703e92c4df164305a68b9936e3dbd4f5""0"40"0""Atch 4 - CMMC-FAQsv6.pdf"446494"file"".pdf""1""2026-07-15T19:20:40.262+00:00""784c5ed684d746d69a9e0b90a3c48896""public""0""public""4fd602c27b79470fb79e5a98c553ec20""0"39"0""Atch 3 - CMMC-Information..pdf"2039567"file"".pdf""1""2026-07-15T19:20:40.262+00:00""04c30a18bed341b1aa97f71ee4185a43""public""0""public""82bfc56eeca842d2a5081991cb2c8f6d""0"38"0""Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf"401500"file"".pdf""1""2026-07-15T19:20:40.262+00:00""0f54c43915484b30af93fac2d9d2189b""public""0""public""b90343a769f044ac8b34836d9747b15e""0"37"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26..pdf"230806"file"".pdf""1""2026-07-15T19:20:40.262+00:00""5c2c5e7690f847d8baa364ab72308066""public""0""public""1293da4bd383472aa176e7fc035dbcfa""0"36"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf"510893"file"".pdf""1""2026-07-15T19:20:40.262+00:00""14579f08f31a4264a20f2fa5200bdd7b""public""0""public""950bc1e3f0234db2bd58f005ef593e8f""0"35"0""AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf"418374"file"".pdf""1""2026-06-24T11:34:40.661+00:00""123dc5b20fef4a6a89357213cbe72777""public""0""public""def67b6aa61c4e658b4b8390fc55df7d""0"34"0""AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf"416086"file"".pdf""1""2026-06-23T18:46:50.679+00:00""7395c0f7ab504786b1fbbd8f62842aae""public""0""public""27ff787f58fe463c9f3b01478289d016""0"33"0""AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf"410646"file"".pdf""1""2026-06-14T14:15:28.406+00:00""f1082f2f81e14662a319e7bf0f15a8bb""public""0""public""47a61ef24bb745abbf8d933ed34b290b""0"32"0""AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf"419563"file"".pdf""1""2026-05-26T14:47:24.226+00:00""0541ad9fecda47ea89dcce67653f6e19""public""0""public""a50abcf88bb94536ad34b7a4c2dccf92""0"31"0""AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf"408261"file"".pdf""1""2026-05-22T11:10:32.718+00:00""2ff11056f2d743f487cc974fe954218e""public""0""public""5d4557a477c746f8b039b88277de0889""0"30"0""Atch 5 - UTSI Map.pdf"544280"file"".pdf""1""2026-05-15T19:30:12.931+00:00""5e6340d527de4004a2937688d4364d65""public""0""public""526506ddef2046db8a8f0333c2b98e17""0"29"0""Summary of Changes-AEDC Velocity Alliance-RWP-Amend 2.pdf"94102"file"".pdf""1""2026-05-15T19:30:12.931+00:00""c75e9fd56d9446dc8722aac95feda81e""public""0""public""8b06227313bb48ef833007cb9d68b3af""0"28"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 2 - 15 May 26.pdf"417394"file"".pdf""1""2026-05-15T19:30:12.931+00:00""02d7e583df544495b6948eab85735faf""public""0""public""66d72bc06a4b4c60a89171d82d0a3a74""0"27"0""AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf"401535"file"".pdf""1""2026-05-12T11:04:43.125+00:00""afb75f3257f548369689c3d254acc3f7""public""0""public""d5caa1f986f547cd8a88fabe10979373""0"26"0""AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf"398181"file"".pdf""1""2026-05-01T19:58:01.793+00:00""91a142b5e8f94aea9229f5305c9e38ad""public""0""public""16a57ab5d27f4230ba6b25004320d823""0"25"0""AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf"392987"file"".pdf""1""2026-05-01T13:14:53.801+00:00""bbd0a4706dc041f5937cff1e8371d8e1""public""0""public""e5454182a40e4af7abfabcfb382d705c""0"24"0""AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf"384868"file"".pdf""1""2026-04-30T13:28:26.774+00:00""e691a8acfcb24834b6ab21094887c5f0""public""0""public""9941896afdd74e7cb74fd275ec525b8b""0"23"0""AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf"378255"file"".pdf""1""2026-04-28T12:43:07.945+00:00""49b6e512f4ee41528a4ab21da9ca6588""public""0""public""116adb33e8ca4e86b2de7be11604c65c""0"22"0""AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf"369576"file"".pdf""1""2026-04-27T11:14:40.303+00:00""df1ccaea144a48aeb206ba6eeeeca1c0""public""0""public""9dc0c344b9444f019d09b542b1425a3a""0"21"0""AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf"362633"file"".pdf""1""2026-04-24T16:09:16.497+00:00""373191e8b77e4f29b57cc876de557e5e""public""0""public""256a342dc5ea4145b50037132293d642""0"20"0""AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf"355311"file"".pdf""1""2026-04-23T11:57:53.917+00:00""ca451cd4e82f44c18a63a41fdf1b62a5""public""0""public""ab62ed2bcedc414c8d72ff294982b813""0"19"0""AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf"329908"file"".pdf""1""2026-04-21T12:13:27.026+00:00""808fc99fcc9844d78e1c802e3ff15e6e""public""0""public""b09907a52c934c7da650d8bb00f02d55""0"18"0""Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf"395064"file"".pdf""1""2026-04-21T12:13:27.026+00:00""e68fd463de514ca4aa49caea907db32d""public""0""public""7cc4633d0e5544d78b683212b9812380""0"17"0""Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf"230806"file"".pdf""1""2026-04-21T12:13:27.026+00:00""8f5349a71db743febf518bdc8d65c504""public""0""public""84586099352b451db9ee33a6a1c3d2df""0"14"0""AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf"416177"file"".pdf""1""2026-04-21T12:13:27.026+00:00""6b68b11bc59d4e9e8a8503b309701d11""public""0""public""e7c544a8c799488685d439b2a0ad1b64""0"12"0""AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf"313954"file"".pdf""1""2026-04-17T16:57:30.548+00:00""4a86f6b5306e439b97635c7ee3acfb4c""public""0""public""543fa8be09db456ca5f1cfa3adfb8073""0"11"0""AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf"308843"file"".pdf""1""2026-04-15T12:17:57.258+00:00""047f9ddfab43403b9c65d0a773c79939""public""0""public""c8d108304f9d4c66a89e659273b63a4d""0"10"0""AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf"290570"file"".pdf""1""2026-03-31T15:24:05.414+00:00""60cc24ac3484429994fdf9ac40d194e7""public""0""public""e00d378b91fb407bba0f73a780b210a4""0"9"0""AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf"280066"file"".pdf""1""2026-03-31T12:17:40.758+00:00""7ef837e62e5e489ab66953ea77c457bf""public""0""public""f8c18cd675854186bba7112eff1b408a""0"8"0""AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf"223275"file"".pdf""1""2026-03-30T12:27:46.825+00:00""01ec79ef1651463baa4aeff1193675bb""public""0""public""7bf67936c32c4043b005ae26ec5ade8e""0"7"0""AEDC Velocity Alliance - Request for Whitepaper.pdf"411381"file"".pdf""1""2026-03-18T12:18:19.513+00:00""7e9c63ae16e3434f94293999a6cf01cc""public""0""public""edf34a64fbed4011b9aa117b25438fad""0"6"0""Atch 4 - CMMC-FAQsv4.pdf"554907"file"".pdf""1""2026-03-17T11:34:05.241+00:00""140f501a74384cefad4f45a782249d7c""public""0""public""d493f90df96c4bf48dda2140230ce68f""0"5"0""Atch 3 - CMMC-Information.pdf"2039567"file"".pdf""1""2026-03-17T11:34:05.241+00:00""afd5d879b0bb4969a1f06b3df271f9fe""public""0""public""e85fd82e550c47839e77f3fe25d9f35a""0"4"0""Atch 2 - AEDC Velocity Alliance Base Articles - 5 Mar 26.pdf"387278"file"".pdf""1""2026-03-17T11:34:05.241+00:00""66edc0c77b5147fa8bfcaf213fa70618""public""0""public""c578b63bf96f462ca25af1430b411d05""0"3"0""Atch 1 - AEDC Velocity Alliance Program Objectives-5 Mar 26.pdf"205130"file"".pdf""1""2026-03-17T11:34:05.241+00:00""98112adf38bd4f08827e428d372d9deb""public""0""public""de9bec4357154fa3b28fd4f6b1b18920""0"2"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice fcf0ac83d57641aeb9a13d5aece3f7e4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.