We post new waste management opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
RFI Questions due NLT 30 July 2026 by 1400 PDT.
Quotes due NLT 11 August 2026 by 1400 PDT.
The requirement is for a contractor to provide all management, labor, tools, equipment, and materials necessary to perform a comprehensive cleaning, CCTV video inspection, and GIS survey of the storm drain system at Vandenberg Space Force Base, California, within 365 days of contract award. This follow-on effort is critical to assessing infrastructure condition, ensuring continuous operational integrity, and preventing system failures that could cause flooding or environmental damage. Work must be executed in accordance with prevailing industry and government standards, including NASSCO Pipeline Assessment Certification Program guidelines, UFGS TV inspection specifications, and base CAD standards. Due to the active military installation setting, the contractor must strictly adhere to security access controls, background checks, and environmental compliance protocols, including biological monitoring for the protected Vernal Pool Fairy Shrimp. Additionally, the contractor must coordinate all material and sludge disposal with the 30CES/CEI Waste Compliance office and remain prepared for potential unexploded ordnance (UXO) monitoring during field operations. See PWS for additional information.
The contractor must provide all management, labor, tools, equipment, and materials to clean all designated storm drains and culverts, conduct CCTV video inspections of the storm drain lines, and produce a comprehensive written report, updated geospatial (GIS) data, and detailed drawings of the surveyed culverts. Work must be performed in accordance with NASSCO Pipeline Assessment Certification Program guidelines, UFGS TV inspection specifications, and base CAD standards. The contractor must also adhere to security access controls, background checks, environmental compliance protocols including biological monitoring for Vernal Pool Fairy Shrimp, coordinate material and sludge disposal with the 30CES/CEI Waste Compliance office, and be prepared for potential UXO monitoring.
"93437-5212""VANDENBERG SFB""CA""USA""ADMINISTRATIVE ONLY NO REQUISITIONS""1515 ICELAND AVE RM 150""Storm Drain Study Phase II_Combo RFQ.pdf"185990"file"".pdf""1""2026-07-22T21:13:02.539+00:00""c30bcf78ac3847988ed94a1f6cae9695""public""0""public""f1bbe0057aa742f6b8df294e4b6a117f""0"52"0""Attach. 1 - PWS_Survey Storm Drains Phase 2.pdf"1181723"file"".pdf""1""2026-07-22T21:13:02.539+00:00""c6a3543d94344647b7ca0144e470c4cf""public""0""public""e8d357b406574be68c4b680de0dd5ffb""0"51"0""Attach. 2 - Storm Drain Study Pricing Schedule.xlsx"25297"file"".xlsx""1""2026-07-22T21:13:02.539+00:00""4b25044c2a1d4ac68e15298f5675def2""public""0""public""822360c5e7d8499296609ae8e30a34d7""0"50"0""Attach. 3 - Appendix A Location of Storm Drain Survey Area.pdf"1705119"file"".pdf""1""2026-07-22T21:13:02.539+00:00""80c84d98212342889b3471bc5b7329c2""public""0""public""45ed097629954f29955d333a7f4fd4e8""0"49"0""Attach. 4 - Appendix B Carsonite Marker Catalog Cutsheet.pdf"1047683"file"".pdf""1""2026-07-22T21:13:02.539+00:00""715396ce3c5349c6a04b2eccb82c188f""public""0""public""22b67e4e2d864b158f8b57b130ca80a5""0"48"0""Attach. 5 - Appendix C VSFB Front End Specification.pdf"2096272"file"".pdf""1""2026-07-22T21:13:02.539+00:00""5ab47f53a3b747129adde0bbda35279c""public""0""public""7764b2289d0b4815b1631d0f9d23c6d3""0"47"0""Attach. 6 - Appendix D UFGS 33 01 30.16 TV Inspection of Sewer Lines.pdf"261214"file"".pdf""1""2026-07-22T21:13:02.539+00:00""bd34a4ce3ace4f21912555784796688d""public""0""public""10531302122b4b589e891cf3865501c1""0"46"0""Attach. 7 - Appendix E XUMU181025B2 Previous Storm Drain Study.pdf"53362488"file"".pdf""1""2026-07-22T21:13:02.539+00:00""a574f82dc15141ddb98b1d16b8438f56""public""0""public""065bf96e6f9b4cf78cf62028d6fff26e""0"45"0""Attach. 8 - Appendix G AF Form 813.pdf"2139759"file"".pdf""1""2026-07-22T21:13:02.539+00:00""b7ebe4259923403a87520e9a68d437f5""public""0""public""8f29b071a89c4256aff3bebf82f13198""0"44"0""Attach. 9 - Clauses and Provisions.pdf"134855"file"".pdf""1""2026-07-22T21:13:02.539+00:00""5fcda50129a44ce8b3cf0f525142f2cb""public""0""public""7a955379563744f88a07ba406a4c2aba""0"5"0""Attach. 10 - SCA WD 2015-5647 Rev. 27_20260513.pdf"4429647"file"".pdf""1""2026-07-22T21:13:02.539+00:00""3c85533faab04684b41df586eb3ebb3c""public""0""public""89f40a31a30343a7a8053f35bcb70180""0"4"0"Source: SAM.gov (notice f8c551ffc92d4ed8a66dfec6063166c1), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.