We'll email you new goods & materials opportunities in Oklahoma as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Amendment 2 posted to incorporate Q&As and extend closing date/time to 9/18/2026, by 1:00pm CST.
Amendment 1 posted to extend the closing date/time to Friday, 9/4/2026, by 1:00pm CST.
Please see solicitation and attachments.
The contractor shall provide one (1) Altitude Test Chamber System Pressurization Blower, Model Number Dearing Compressor and Pump Co. Pressure Blower System, Part Number DSP-2505-8CM-6-50 or equal. The blower shall be a centrifugal multistage blower with a 100 HP TEFC premium efficient motor, 460 VAC, 3 phase, 60 Hz, fixed speed 3550 rpm. It shall have 8-inch nominal pipe size ANSI Class150 pound flanges on both the air inlet and outlet. The blower shall be skid mounted as a packaged unit with all required motor and blower shaft coupling components and rotational safety guards. The blower shall be a direct replacement for the existing Pressure Blower System Model 38406A, Serial Number 27335 and shall meet all form, fit, and functions of the original unit.
"73145-3303""TINKER AFB""OK""USA""CP 405 734 9107""3001 STAFF DR STE 2S76""Amendment FA812526Q007800002.pdf"381009"file"".pdf""1""2026-09-12T21:57:40.335+00:00""0960cf6e66d941a7853163029f7572d5""public""0""public""158a9d8819f54aa0b9566d2c0c4794a1""0"6"0""Solicitation Qs and As.pdf"86521"file"".pdf""1""2026-09-12T21:57:40.335+00:00""d94883a79e99439dbd6e228fc8188981""public""0""public""66f4de6496a9423c834765ff2ee3860a""0"5"0""Amendment FA812526Q00780001.pdf"380486"file"".pdf""1""2026-08-25T15:32:58.309+00:00""383c6f62588248198f01d25134abc816""public""0""public""76d444c6e95d4ba29dad900a8a180a72""0"3"0""Solicitation FA812526Q0078.pdf"4566691"file"".pdf""1""2026-08-10T19:09:07.315+00:00""632d75df49c0457790ee14f6142aa972""public""0""public""0fc1c631453144fb91ea0f3f63859a51""0"2"0""C26-032 Altitude Test Chamber Blower Replacement - Item Description Updated 07-30-2026.docx"66230"file"".docx""1""2026-08-10T19:09:07.315+00:00""c57b2c1bb4ad49b6bbb0a7b5139d5e6e""public""0""public""296c804b511e46caacbac1e7b450929e""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice f501623ab3bc4352bce806c227c9aa44), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.