We'll email you new asphalt opportunities in New York as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Amendment 0002 - Provide Due Date extension for Technical Questions.
Please note that solicitation #36C77626B0020 is related to the Sources Sought notice # 36C77626Q0137 which serves as the presolicitation.
In accordance with 15 USC 644, this project is a competitive small business set aside.
This project is located at:
Brooklyn VA Medical Center
800 Poly Place
Brooklyn, NY 11209
Please see attachements for additional details on this procurement.
The project tasks are broken into three categories. The first category (Task Nos. 1, 2 and 3) is to install a dedicated life safety branch in the VA Brooklyn campus's Building 1, including automatic transfer switches (ATS) and electrical distribution equipment on each floor with loads dedicated to the life safety branch. The second category (Task No. 5) addresses electrical distribution equipment that requires upgrade and/or replacement to exceed the expected three-phase asymmetrical fault current. The third category (Task Nos. 6 through 26) addresses equipment code violations determined during a previous electrical study.
"US""44131""INDEPENDENCE""OH""USA""6150 OAK TREE BLVD""SUITE 300""36C77626B0020 0002.pdf"186937"file"".pdf""1""2026-10-14T22:29:29.567+00:00""0d816dbb9ba847f4b3758f8cd1926ce9""public""0""public""b9aaeae5f4d34626a63f13bdcaac90e5""0"11"0""36C77626B0020 0001.pdf"187490"file"".pdf""1""2026-10-13T18:04:44.739+00:00""e6b074a23b064ae883bdc4120b312585""public""0""public""333cb726900547e895f511230890400e""0"10"0""Brooklyn VAMC Map.pdf"146585"file"".pdf""1""2026-10-06T19:04:32.713+00:00""850b802f62514ad3844d6e2822d948af""public""0""public""6628eef40d2e47da9edff1ff8e7aab7a""0"9"0""36C77626B0020 Brooklyn VAMC Construction.pdf"692546"file"".pdf""1""2026-10-06T19:04:32.713+00:00""27b726c7f6344ec6bd7e19a7850b2320""public""0""public""bc45777835c24e6b9f2067024a85495c""0"8"0""Attachment G - RFI TRACKING SHEET.xlsx"13550"file"".xlsx""1""2026-10-06T19:04:32.713+00:00""4cda4dd9d44e48d1810b9ae211d3e845""public""0""public""22444ec2492f4c0e8a86687bdf147ad2""0"7"0""Attachment F - Site Visit Instructions.pdf"49135"file"".pdf""1""2026-10-06T19:04:32.713+00:00""dc2f2c4b75b6410e9472bb0eba05df04""public""0""public""69846d5349c94ad19e76c8f295f0eedd""0"6"0""Attachment E - Wages Rates - King County 5-26-26.pdf"6578059"file"".pdf""1""2026-10-06T19:04:32.713+00:00""c96c2bff24874bd78b504e8dd8393146""public""0""public""a32bbe738ca44de5abaaa2c48fff6919""0"5"0""Attachment D - Drawings.pdf"11763917"file"".pdf""1""2026-10-06T19:04:32.713+00:00""1d8ed78166214c3fa3152d7efa43b761""public""0""public""4d38c458e71441f382eaf483e1e7c04a""0"4"0""Attachment C - Drawings.pdf"18034623"file"".pdf""1""2026-10-06T19:04:32.713+00:00""b3d29a7a0bfa42b7b0314886fe2deddd""public""0""public""57eab724d1004360a604e6712a949c1c""0"3"0""Attachment B - Drawings.pdf"12289301"file"".pdf""1""2026-10-06T19:04:32.713+00:00""e888942ce763414d9cc74f0d70ca7cb9""public""0""public""8ec66250da854a9599c90e893f424213""0"2"0""Attachment A - Specifications - 3-11-26.pdf"7764540"file"".pdf""1""2026-10-06T19:04:32.713+00:00""465dd4d5530c48b6bd9ae7c2498a241c""public""0""public""88edca194a5b447ab4fe1a722491caf1""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice eefa86dd5fa0440cafd4aa229380afab), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.