16.5 ROAD MANUAL HAZARD FUELS REDUX
The contractor shall furnish all labor, equipment, supervision, vehicles, materials, and incidentals to perform manual hazardous fuels reduction on a 101-acre unit. Work includes cutting and piling Gambel Oak stems over 24 inches high and less than 5 inches dbh, cutting and piling Service berry and mixed mountain shrub over 24 inches high (except sagebrush), cutting and piling Pinyon and Juniper stems under 5 inches dbh, limbing remaining juniper to 5 feet or one third of tree height, cutting and piling all standing and fallen dead trees and brush, cutting and piling all shrubs, oak, juniper and pinyon beneath and/or within 10 feet of the dripline of all Ponderosa Pine, and cutting stumps flush with the ground and less than 4 inches in height. Material to be hand-piled includes all cut material and existing slash between 1 inch and 24 inches in diameter and greater than 2 feet in length. Piles must be compact, with a maximum size of 8 feet in diameter by 8 feet in height and a minimum size of 6 feet in diameter by 5 feet in height. The contractor is also responsible for transportation, all personnel, equipment, fuels, lubricants, parts, repairs, and waxed paper or polyethylene plastic sheeting for covering piles.
We post new agriculture & food opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""83705""BOISE""ID""USA""3833 SOUTH DEVELOPMENT AVENUE""Sol_140L3726Q0163_Amd_0001.pdf"206182"file"".pdf""1""2026-08-14T16:40:33.851+00:00""773c8427912243c988d0508d2715c2cb""public""0""public""af9c232c295c4ee8b19459aaf458e7ba""0"3"0""Map_16_5_Rd_Fuel_Breaks_0001.pdf"1110009"file"".pdf""1""2026-08-14T16:40:33.851+00:00""01a1e1478fbe41d492ed9bac56f76976""public""0""public""1e53aacd4e084ebfbc32ac5aab0ef970""0"2"0""Solicitation_140L3726Q0163_-_16_5_Road_Manual_Fuels.pdf"436437"file"".pdf""1""2026-08-14T15:58:14.939+00:00""c279fddec27d46d193086a1851824883""public""0""public""31135de86ca34572b0e6d4ee5ae33b5f""0"1"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice e9a8f48178024a95bd287f75c8068b12), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.