Read the notice and its 11 attached documents and pull out the scope, the deadlines and what you have to submit.
We post new interior maintenance opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
AMENDMENT 0003 - The deadline for submitting quotes will now be amended to Tuesday, 18 August 2026 at 3pm (EST).
AMENDMENT 0002 - The purpose of Amendment 0002 to Solicitation W15QKN-26-Q-A141 are as follows: 1.) To extend the proposal submission date. FROM: Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 03:00 PM (hour) local time 04 Aug 2026 (date). TO: Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 03:00 PM (hour) local time 10 Aug 2026 (date). 2.) To extend the Solicitation question submission date until 10:00AM EST, WEDNEDSAY, 5 AUGUST 2026. 3.) To update the Performance Work Statement and to provide technical photographs. All other terms and conditions of Solicitation W15QKN-26-Q-A141 remain unchanged and in full effect.
AMENDMENT 0001 - The purpose of Amendment 0001 to Solicitation W15QKN-26-Q-A141 is the following: 1.) To revise the point-of-contact information for the Requiring Activity from Mr. Paul Lavoie (Engineer, Devens Reserve Forces Training Area) to Mr. Zygmunt Osiecki (DPW Director, Devens Reserve Forces Training Area, e-mail: zygmunt.v.osiecki.civ@army.mil ) and 2.) To add the available site-visit dates/time as: Tuesday, 28 JULY 2026 at 8:00am (EST) or Friday, 31 JULY 2026 at 8:00am (EST).
The U.S. Army Contracting Command - New Jersey has a new construction requirement in support of the U.S. Army Garrison - Devens RFTA for the removal and reinstallation of a new drop-ceiling grid system and tiles located at Devens RFTA Building 623, Hall of Flags Conference Center, 42 Quebec Street, Devens, MA 01434. The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, incidentals, and services required to perform and complete the work necessary to fully remove and reinstall a new drop ceiling grid system and tiles. Please see the attached Performance Work Statement (PWS) and Solicitation document.
"07806-5000""PICATINNY ARSENAL""NJ""USA""KO CONTRACTING OFFICE""BUILDING 10 PHIPPS RD""Solicitation Amendment W15QKN26QA1410003 SF 30.pdf"3989163"file"".pdf""1""2026-08-10T19:00:47.986+00:00""68565101ae0348d392bbf5cc36f324b8""public""0""public""0087ec7a4fa0449bb2c22c69d5a34645""0"12"0""Attachment 0007 - Technical Photos - B623 Drop Ceiling Grid System d.7-31-26.pdf"3986828"file"".pdf""1""2026-07-31T14:58:23.571+00:00""32a5f8fde2024f95bcee2389bd183a5a""public""0""public""2ea49649cf4f4ede81b6174312dff3e4""0"11"0""Attachment 0001 - PWS - B623 Drop Ceiling Grid System Demo and Install d.7-31-26.pdf"1940416"file"".pdf""1""2026-07-31T14:58:23.571+00:00""c0cef5fb43254a37a165efbc32124476""public""0""public""7ff49450cfcc46dbb5afe37bc2bd30db""0"10"0""Solicitation Amendment W15QKN26QA1410002 SF 30.pdf"4028982"file"".pdf""1""2026-07-31T14:58:23.571+00:00""1a4bdcc9a7524d9e8de7f23a8643e35c""public""0""public""6b2b5612991a4ca99ee30a5b89b6973b""0"9"0""Solicitation Amendment W15QKN26QA1410001 SF 30.pdf"4041423"file"".pdf""1""2026-07-26T16:23:01.213+00:00""04e92f4790834e8d83b226fb2c496ba2""public""0""public""436531755f2e426e9f922b45e2a4ba77""0"8"0""Attachment 0006 DBA MA20260004 18 May 2026.pdf"54234"file"".pdf""1""2026-07-22T18:12:39.569+00:00""e2dff2e8b9484f169ff94d3dab02ec13""public""0""public""05ddf78e57444b68a90607bcc6e4b41a""0"7"0""Attachment 0005 Performance Bond.pdf"890848"file"".pdf""1""2026-07-22T18:12:39.569+00:00""bafe5520f7474d12b179eef4e686f7a7""public""0""public""1c6314cb18044856ab27d126d5f7af93""0"6"0""Attachment 0004 Payment Bond.pdf"795841"file"".pdf""1""2026-07-22T18:12:39.569+00:00""025eed5d129d4f668fe94bf3cf09ff4a""public""0""public""7f88a95cd9034d7284335e33456f2ad4""0"5"0""Attachment 0003 Bid Bond.pdf"932275"file"".pdf""1""2026-07-22T18:12:39.569+00:00""900f2a373f8349969b53102340fa56b4""public""0""public""4d54b3f22d2344739200f890f1181f23""0"4"0""Attachment 0002 Construction Cost Breakdown.xls"59392"file"".xls""1""2026-07-22T18:12:39.569+00:00""22fe0811ed684c73a9f1dce32ec1c0fb""public""0""public""3b660fbff73d4d5791b1cae198aeb424""0"3"0""Solicitation - W15QKN26QA141.pdf"6560065"file"".pdf""1""2026-07-22T18:12:39.569+00:00""d20aa8b721904cdba3d6fd1333b5ea51""public""0""public""61743d1fca4a48c5a42c6c9a321f3416""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice e118fb98a154418e8a50f307672d9879), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.