Fermi National Accelerator Laboratory (FNAL) is building a next generation proton accelerator called the Proton Improve Plan II (PIP-II). FNAL is soliciting proposals for Reclosable Pressure Safety Relief Valves to protect from overpressure.
Proposals can be submitted directly to the Primary Contact listed on this notice and within the RFP Document. Pricing must be submitted using the Request for Proposal Pricing Sheet, Exhibit G, which is located at the end of the RFP document.
The selected subcontractor shall provide all labor, materials, tools, equipment, and supervision required to manufacture, assemble, inspect, test, package, and deliver 25 cryogenic reclosable pressure safety relief valves in accordance with the applicable Statement of Work and Technical Specifications specified in Exhibit A. The valves are for the Cryomodules (CM) helium bath volume and must comply with ASME Section VIII Code NB/UV stamping, be for cryogenic helium service, and meet specific technical requirements including flange connections, radiation-tolerant materials, KEL-F (PCTFE) seats, and in-situ testing provisions.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""RFP 387881-DSF.pdf"309212"file"".pdf""1""2026-10-14T18:57:33.474+00:00""5d09d1e6cf2349f684153896f42ce077""public""0""public""1ca22ac2faea41ef8cb4190b69a1b957""0"19"0""A. Specification ED0049128 CM Relief Valves.pdf"880356"file"".pdf""1""2026-10-14T18:57:33.474+00:00""ea13df6c33cb42deb0bace7043744d64""public""0""public""1c1807a4aaf44f4bb83459c9e0f98240""0"18"0""B. FFDG General Terms and Conditions for Supplies (08.2025).pdf"346347"file"".pdf""1""2026-10-14T18:57:33.474+00:00""4eda3b7d8c374211a2cab19a4b4ceb19""public""0""public""05c68fcb6b2c49948e80a2b2a14d95c6""0"16"0""C. PROC-FRM-100_Subcontractor Certs.pdf"482741"file"".pdf""1""2026-10-14T18:57:33.474+00:00""08e930bbebd5450f9e4bd22adfd2fe2d""public""0""public""3a11801834f54fdab124660ca3c941d1""0"15"0""D. PROC-FRM-466_Proposal Certs.pdf"415824"file"".pdf""1""2026-10-14T18:57:33.474+00:00""a8dfda69e4b94202bcbe860df776fd3e""public""0""public""16652b10d6b94a4a8fdb2cbb80f8d5c4""0"14"0""E. Compliance With Federal Anti-Discrimination Laws.pdf"284258"file"".pdf""1""2026-10-14T18:57:33.474+00:00""3dae529f14d9404e9c28fe27fd879b12""public""0""public""f11dc4eae9ed422a927772a2fd57f364""0"13"0""F. FL-55 Small Business Subcontracting Plan.pdf"401439"file"".pdf""1""2026-10-14T18:57:33.474+00:00""09ca535e187348dbadd4254eb6220700""public""0""public""393d5c48e52a4144a5c380d8c06c136d""0"12"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice dfd5f724ed44466e91a5afa8af3eef56), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.