THE PURPOSE OF THIS SOLICITATION AMENDMENT 2 IS TO EXTEND THE CLOSING DATE TO 15 OCT 2026, ATTACH AMENDMENT WITH CHANGES AS INDICATED, ATTACH QUESTIONS AND ANSWERS.
THE PURPOSE OF SOLICITATION AMENDMENT 1 IS TO EXTEND THE CLOSING DATE TO 12 OCT 2026 AS CONTRACTOR QUESTIONS AND ANSWERS ARE FORTHCOMING.
THIS SOLICITATION W519TC26QA192 IS FOR A 3 TON OVERHEAD CRANE AND HOISTS IAW ATTACHED RIPD. PLEASE NOTE, A SITE VISIT IS SCHEDULED FOR 23 SEPT AT 9AM. REGISTRATION IS REQUIRED TO ATTEND AT LEAST THREE DAYS PRIOR. QUESTIONS REGARDING THIS SOLICITATION ARE DUE NLT 29 SEPT 2026.
The contractor shall furnish and install one new 3-ton top-running overhead bridge crane with an underhung trolley and hoist system in Building 211-1 East Bay at RIA-JMTC. The crane shall be a single-girder, top-running bridge crane with DC disc-type brakes, variable-speed bridge drive (8-80 fpm), two-speed trolley (20/80 fpm), and a wire-rope hoist (H4 duty or better, 5/16 fpm). The system must include a wired hand pendant, safety lighting (load-path positioning light and overhead awareness light), bumpers, and all required markings. The contractor is responsible for all labor, materials, and installation, including site preparation, excavation, foundation work if needed, and connection beyond facility utility points. The contractor must also provide CDRLs, operator and maintenance training, and a one-year parts and labor warranty.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"61299-0000""ROCK ISLAND""IL""USA""ACC ROCK ISLAND BLDG 60""3055 RODMAN AVE""CRANE AND HOIST CONTRACTOR QUESTIONS AND ANSWERS RESPONSES FINAL.pdf"348069"file"".pdf""1""2026-10-07T18:16:49.36+00:00""74cc5c04aedb4c4d96024d3e68852113""public""0""public""e4dfb0755cbf4109adab8f96d6fc6088""0"7"0""B08 W519TC26QA192 AMENDMENT 2.pdf"1493602"file"".pdf""1""2026-10-07T18:16:49.36+00:00""3b36b0fd011b402083de7c08643ee9b3""public""0""public""955c2e302048420bb67c944cfcfbf23b""0"6"0""B08 W519TC26QA192 AMENDMENT 1.pdf"1491897"file"".pdf""1""2026-09-30T18:25:38.935+00:00""a4a2e4c716204a4b9e9a46cf81a5243b""public""0""public""dfa26765c5d541c4b97fb1d94d51099f""0"5"0""B08 ATTACHMENT 003 SITE VISIT LOCATION.pdf"191001"file"".pdf""1""2026-09-08T16:30:38.372+00:00""ea664b3689b64d2ab6b5a7f3b497a059""public""0""public""c73ce385b09a4a45bff6c55e2e80992f""0"4"0""B08 ATTACHMENT 002 27-2-07 CDRL.pdf"543169"file"".pdf""1""2026-09-08T16:30:38.372+00:00""a8a4ef1a7b5047978684806929aaa1ab""public""0""public""fa997b036d334fc2be79765fb7ce2d88""0"3"0""B08 ATTACHMENT 001 RIPD E4000 27-2-07 FINAL.pdf"332619"file"".pdf""1""2026-09-08T16:30:38.372+00:00""0d0ebfe2374341c68ce4302d7982bc32""public""0""public""e8ecc1b9c80b4161a20f468474afad5d""0"2"0""B08 W519TC26QA192.pdf"372767"file"".pdf""1""2026-09-08T16:30:38.372+00:00""fd27e23ca7494450b0a0f16f186ec05b""public""0""public""01e76412711f41039496ea68585d48ed""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice dc9631fe56ea4cbe8c2042642253dc18), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.