ROOF REPAIR
The contractor shall perform all demolition, furnish all equipment and materials, and perform required work to repair or replace the flat roof on the San Luis Lakes Pumping Plant Building. The work includes either roof repair (remove damaged materials, patch membrane, repair flashing, repair drains, address ponding) or full roof replacement (remove entire roofing system, inspect and replace decking, install new insulation and flat roof system, install new flashing, re-establish drainage). The contractor must also provide drainage improvements, debris management, safety compliance, and protect pumping plant operations. The contractor shall submit various submittals including a project schedule, safety plan, installation methods, as-built drawings, and warranty information. The contractor must comply with all applicable federal, state, and local building codes, and provide a minimum 10-year manufacturer material warranty.
We post new roofing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""84138""SALT LAKE CITY""UT""USA""125 SOUTH STATE ST""ROOM 8100""Sol_140R4026Q0141.pdf"667539"file"".pdf""1""2026-10-08T15:01:31.725+00:00""76cb5e549ecc4f0fa7b32ac3d11e9bf5""public""0""public""6c126ffea69f45a5b837d6a8dfdad660""0"6"0""Attachment_1_-_SLV-CB_PUMPING_PLANT_ROOF_SOW.docx"516163"file"".docx""1""2026-10-08T15:01:31.725+00:00""98558584ad314df3ba6b96071876e791""public""0""public""409b7928b9484f4f84c049059a8331a5""0"5"0""Attachment_2_-_Pricing_Schedule_fillable.xlsx"12706"file"".xlsx""1""2026-10-08T15:01:31.725+00:00""843b916891d74686baf42fe9814631b5""public""0""public""e90a4ab05efc4a73932053836067bd43""0"4"0""Attachment_2a_-_Pricing_Schedule_Repair.docx"21101"file"".docx""1""2026-10-08T15:01:31.725+00:00""6056cb3bcf8e49ee88d240bb0c353482""public""0""public""8e74bc85c03d43aaad0b66b199f0002f""0"3"0""Attachment_2b_-_Pricing_Schedule_Replacement.docx"21114"file"".docx""1""2026-10-08T15:01:31.725+00:00""85b44b31cf924c2e87f4c5650b2e3a86""public""0""public""3e0951c545f4485db4102efc279e1304""0"2"0""Attachment_3_-_DBA_WD_CO20260001.pdf"70738"file"".pdf""1""2026-10-08T15:01:31.725+00:00""78780b310a4e45669c5324f27565d97c""public""0""public""10b889646afe4b7d850bb782858efc6b""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d808e0c42197405c9e417fe8b9eabfa8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.