Read the notice and its 4 attached documents and pull out the scope, the deadlines and what you have to submit.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ���� Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ?
Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ � Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60�F (15.6�C) in freezing or cold-weather conditions ?
Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0�F (-17.8�C) ________________________________________���� Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ?
Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ���� Structural and Mounting Specifications ?
Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ?
Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ � Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)
"13602-5220""FORT DRUM""NY""USA""KO DIRECTORATE OF CONTRACTIN""45 WEST STREET""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U4017¬iceType=CombinedSynopsisSolicitation"0"link""1""2026-08-10T20:54:12.545+00:00""9a14427f183a496e9facebc85b79f8a1""public""0""PIEE Solicitation Module Link for W911S226U4017""public""de5c6647c7de4e5f9519572b6a8b9e96""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-08-10T20:54:12.545+00:00""fa2a152af8f84bf784a2c54cf3f434c1""public""0""Web Based Training for the PIEE Solicitation Module""public""15d4219cd4124241af3effddaa774462""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-08-10T20:54:12.545+00:00""9c19e2cc14ee4cac875bcd2d7085cf50""public""0""Registration Instructions for the PIEE Solicitation Module""public""26bf39fde8f64a878aeb9cee430d0243""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-08-10T20:54:12.545+00:00""92c998b8f1ec4239bb05675d30285093""public""0""Department of Defense Procurement Toolbox""public""1a55d39e6ce84960818203a77870bbbe""0"1"0"Source: SAM.gov (notice d5979f2abb544b6981b4dd5a2a2139bc), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.