Forest Service Fernan Ranger Station lift station electrical repairs in accordance with the statement of work.
Solicitation number 1240LU26Q0125 is issued as a request for quotation (RFQ).
The magnitude of the project is under $25,000.
The work involves repairing the electrical infrastructure at the Fernan Ranger Station sewage lift station. Specific tasks include replacing the corroded disconnect switch, circuit breaker, and control box housing with moisture-proof and corrosion-resistant components; replacing worn or damaged power cables and installing them in waterproof conduit; and replacing the existing light fixture with a low-profile, hard-wired LED fixture with a switch accessible from the vault entry.
We post new electrical opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""83815""COEUR D ALENE""ID""USA""SUPERVISORS OFFICE""3815 SCHREIBER WAY""1240LU26Q0125 Amendment 1.pdf"85375"file"".pdf""1""2026-10-09T16:38:00.073+00:00""1f1e403f42af476b8e8cc51bf315e8e4""public""0""public""af51c88f4a774d1d9bd140145b7537fe""0"7"0""Attachment 3- SOW Amendment 1.pdf"218121"file"".pdf""1""2026-10-09T16:38:00.073+00:00""323b0d6084ae49368afc0b20f206503a""public""0""public""e1ebf1eb17244b3bb6dd470af2b82fb3""0"6"0""1240LU26Q0125 Fernan lift station repairs.pdf"504681"file"".pdf""1""2026-10-06T14:56:54.747+00:00""21ed2cfa601e4984b30ebea9ec5a570b""public""0""public""a7c6887e621448c687b735757906d79c""0"5"0""Attachment 2 - Schedule of items Fernan lift station.pdf"38622"file"".pdf""1""2026-10-06T14:56:54.747+00:00""47b21458408c4540b8b76c75b6859ef1""public""0""public""23185e9d532d4963a9f45a2323b9daa9""0"4"0""Attachment 3 - SOW Fernan lift station.pdf"1691890"file"".pdf""1""2026-10-06T14:56:54.747+00:00""85b733a3af7c4c469dcab0808dfe5bce""public""2026-10-09T16:38:00.073+00:00""1""public""f37a4565f41d4b09987b930296f20f7f""0"3"0""2026-10-09T16:38:00.073+00:00""Attachment 4 - Wage Determinations id107.pdf"71270"file"".pdf""1""2026-10-06T14:56:54.747+00:00""107d9f0a53614b03a078c8ab62422b7b""public""0""public""4b27ec852a6c49828e793911998fec60""0"2"0""Attachment 5 -Experience Questionnaire.pdf"548754"file"".pdf""1""2026-10-06T14:56:54.747+00:00""70e2076d958544d2817e8e33acb08553""public""0""public""c4f6b005ab0f428c848c7d3ce2170838""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d355e978746b47ad8e994e3b6e6c3b62), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.