Solicitation for contruction project, WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert Improvements
The Invitation for Bid (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.101-4 are posted under attachments.
The project consists of culvert improvements at six locations (Sites 1, 2, 3, 4, 7, and 8) on the Little Pend Oreille National Wildlife Refuge. Work includes mobilization, construction survey and staking, contractor quality control and testing, construction scheduling, soil erosion control (temporary stream diversion, fiber rolls, watering for dust control), clearing and grubbing, removal of cattle guards, roadway excavation, placed riprap (Method A, Class 3), roadway aggregate (Method 2), installation of precast reinforced concrete box culverts (various spans and rises), structural plate pipe-arch, removal and reset of gates, equipment rental (dump truck, motor grader, hydraulic excavator, chain saw), general labor, turf establishment, willow and cottonwood pole cuttings, rolled erosion control product (woven coir fabric), sign systems, temporary traffic control (barricades, construction signs, traffic control supervisor), and mitigation work (rock weirs, log barriers, root wads, fish passage boulders, streambed material, streambed channel realignment). The project is divided into three bid schedules (A, B, C) covering different sites.
We post new plumbing opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""Physical Data_WA FWS LPO MULTI(1).zip"65439078"file"".zip""1""2026-09-17T13:59:44.119+00:00""50841d22cc25436dbc34652ff7ce1ac2""public""0""public""7f9a70ed776346048076af7bd0fb5692""0"5"0""IFB_69056726B000007_WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert Improvements.pdf"22138997"file"".pdf""1""2026-09-17T13:59:44.119+00:00""7bdc9fbc4add4d6898f2eb84988f6cdd""public""0""public""e3019a617f724f77893d3db96a438ea6""0"4"0""waw-lpo-multi1_plans_IFB.pdf"24622630"file"".pdf""1""2026-09-17T13:59:44.119+00:00""0fa9d6f89a604049933ca83d8d09b89e""public""0""public""86a368f3c4ec482c98f58328f4bfefac""0"3"0""WFLHD Construction Contract Administration_FY 23 V2.pdf"165441"file"".pdf""1""2026-09-17T13:59:44.119+00:00""48661ad9b75d4e10ba78796329554fed""public""0""public""f41f3667e15743f6a224bbf6ccd95b35""0"1"0""https://meet.google.com/yco-jwhb-sux""Link to Virtual Bid Opening"0"link""1""2026-09-17T13:59:44.119+00:00""7eebaeb58932456da459f98b169a67ef""public""0""Link to Virtual Bid Opening""public""60e494bb16184839ad7e3de4f16a1db8""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d2185cb9e3714cc1b009671d62ef78dd), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.