Crude Oil Phase Behavior (PVT) System per attached specifications
IRA Funding
DCI Phase FX15 PVT Cell (Brand Name or Equal)
Oil & Gas Center of Excellence
Crude Oil Phase Behavior (PVT) System per attached specifications IRA Funding DCI Phase FX15 PVT Cell (Brand Name or Equal) Oil & Gas Center of Excellence
The contractor must deliver a fully assembled, factory-tested Crude Oil Phase Behavior (PVT) System that includes a floating piston high pressure vessel with mixer for making live crude oil, a floating piston accumulator for collecting phase samples, a gasometer for measuring gas volume, a dual cylinder syringe pump for fluid transfer, a floating piston accumulator, a floating piston recombination cell with magnetic stirrer and rocking mechanism, and software for automation and data management. The system must meet specified pressure, temperature, volume, and material requirements. The contractor must also provide on-site installation, commissioning, site acceptance testing, and operational and maintenance training at the DOE/NETL facility in Pittsburgh, PA.
We post new goods & materials opportunities in West Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""26507""MORGANTOWN""WV""USA""3610 COLLINS FERRY ROAD""https://www.fedconnect.net/FedConnect/?doc=89243326QFE000572&agency=DOE"0"link""1""2026-09-02T14:14:07.716+00:00""1c3f810a55aa46dba50d8555a19b1a86""public""0""Click here to see more information about this opportunity on FedConnect""public""043642d9ed524b9b9709f24095fb1d4c""0"1"0"Most West Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice ce487af5025c4a3c87b6288ad8420ef0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.