A00002 - The purpose of this amendment is to:
Incorporate the revised drawing and specification sections. The revised drawings are labeled Attachment C_GLS Administration Building Drawings_RV1.pdf. The revised technical sections are labeled GLS Administration Building Technical Specifications_Revised Sections 09.03.26.zip. See the continuation page for additional details.
The due date for offers remains unchanged.
//NOTHING FOLLOWS//
A00001- The purpose of this amendment is to:
Correct the size standard listed within the RFP. This acquisition is solicited as a 100% Total Small Business Set-aside under NAICS 236220, Commercial and Institutional Building Construction with a Size Standard of **$45,000,000.00. **
The proposal due date remains unchanged.
Offerors must acknowledge receipt of this amendment by signing and returning one (1) copy of this SF30 with their proposal submission.
//NOTHING FOLLOWS//
Project: Construction of New Administration Building and Maintenance Garage in Massena, NY.
This acquisition is solicited as a 100% Total Small Business Set-aside. NAICS Code: 236220, Commercial and Institutional Building Construction, Size Standard -$45,000,000.00.
This acquisition will be awarded in accordance with FAR RFO Part 15. Offerors must be registered in the System for Award Management (www.sam.gov.).
Site Visit: September 09, 2026, 10:00am EST. See Site Visit Instructions (Page 27 of RFP).
Questions due: September 11, 2026, 2:00pm EST. Email to: chora.snyder@dot.gov
Offers due: September 25, 2026, 2:00pm EST. Email only to: chora.snyder@dot.gov
The scope includes all plant, labor, equipment, materials, and supervision to complete general site work and grading, paving, access road, temporary and permanent fencing, foundation and floor slab construction, building erection, building interior and exterior finishes, plumbing systems, heating, ventilating and air conditioning (HVAC) systems, electrical, communications and fire alarm systems, storm and sanitary sewer systems, connections of building utilities to existing tie-in points, and storm water control as required for regulatory compliance. The work also includes demolishing existing paving and scrap metal recycling of large steel frame structures stored on-site, as well as fencing alterations. The contractor shall construct the new Administration Building and Maintenance Garage strictly in accordance with the approved A/E design drawings, technical specifications, and performance standards provided.
We post new general contractors opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""13662""MASSENA""NY""USA""180 ANDREWS STREET""6923G526R0094 A00002.pdf"295755"file"".pdf""1""2026-09-03T15:35:26.997+00:00""ccf1e0aa6d4c4f7598bcd9d3297d913f""public""0""public""71ff4323f2a94eb2a0c5c3b3e561dba1""0"24"0""Attachment C_GLS Administration Building Drawings_RV1.pdf"100708130"file"".pdf""1""2026-09-03T15:35:26.997+00:00""d81f4576518c4879aae1e66b01c81cfa""public""0""public""a8cf466c1ff54b8587ecc99b3673f56c""0"23"0""GLS Administration Building Technical Specifications_Revised Sections 9.03.26.zip"315036"file"".zip""1""2026-09-03T15:35:26.997+00:00""b1aacd4036094a738f1c06e5f5f8bf5b""public""0""public""1078157d613e4b1ba992907187569df4""0"21"0""6923G526R0094 A00001.pdf"613970"file"".pdf""1""2026-08-28T12:02:55.723+00:00""6599de5157694384bc0d164725c6755e""public""0""public""e1b3af394ac040bc87e83733acce0973""0"20"0""RFP_6923G526R0094_RV1.pdf"739172"file"".pdf""1""2026-08-28T12:02:55.723+00:00""1f7a7f9bbdf049caaf352bdd4fb9e6cf""public""0""public""f865d95e523e49858d0b11bccb691915""0"19"0""Attachment A_Statement of Work.pdf"263968"file"".pdf""1""2026-08-27T15:46:07.413+00:00""d2e2754ed70d4f62aa0a54486e0f1b24""public""0""public""ce0daa65e50b4ff2afd705b99dc8fccb""0"16"0""Attachment B_Pricing Sheet.xlsx"12080"file"".xlsx""1""2026-08-27T15:46:07.413+00:00""decf2f0c2fcb476b9dfc1b5a90014d1c""public""0""public""4dc9d1e9950c4f3fb7117bd2512d428a""0"15"0""Attachment C_GLS Administration Building Drawings.pdf"63437683"file"".pdf""1""2026-08-27T15:46:07.413+00:00""0c47da35fc58440b9572e1d7edf0648c""public""0""public""51a98d83d3ca407e99f4a68b1cab246a""0"14"0""Attachment D_GLS Administration Building Technical Specifications.pdf"23914611"file"".pdf""1""2026-08-27T15:46:07.413+00:00""f9f6ca5970d745a1a4f9472378ec724d""public""0""public""9a27ff6dd52c4a80b605916c123d41b1""0"10"0""Attachment E_Brand Name Justification_Redacted.pdf"147055"file"".pdf""1""2026-08-27T15:46:07.413+00:00""84c5dc6903e0455cbce88e4573b0cdec""public""0""public""60c8db51c0a0443aabe3c5bd0fae029a""0"6"0""Attachment F_Davis Bacon WD NY20260116.pdf"247476"file"".pdf""1""2026-08-27T15:46:07.413+00:00""2fa999b5d2a44914afaee8e8c34303d2""public""0""public""621d33c203af4d4db82b219e024e0377""0"5"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice cd7a100dc73a4d75bb5bfd98cd24df6e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.