The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) has a construction requirement for raised flooring replacement. Please see attached Solicitation (N6660426Q0473) and all attachments for full information and details regarding this requirement.
Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.
Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.
A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.
You must request access to the attachment by clicking on its title and providing the reason you need access.
You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.
Your entity is responsible for managing the documents in accordance with prescribed directives.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control, and transportation necessary to perform construction services for B1346 4th Floor Raised Flooring Panel Replacement, Multiple Rooms in accordance with Drawing #26-013A and Government Specifications. The work includes CLIN 0001 for the raised flooring replacement and CLIN 0002 for construction submittals (not separately priced). The contractor must also comply with U.S. Army Corps of Engineers EM 385-1-1 and OSHA standards, and furnish required Performance and Payment Bonds within 10 days of award.
We post new flooring opportunities in Rhode Island as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"02841-1703""NEWPORT""RI""USA""1176 HOWELL ST""RFQ N6660426Q0473.pdf"213493"file"".pdf""1""2026-08-26T17:31:02.619+00:00""e4b054be234e42e78a5c84606acd44c4""public""0""public""15084a35e79c4550b9efeeea1fab3b4f""0"7"0""Attachment 1 - NUWC - Raised Flooring Replacement - Drawing.pdf"1511543"file"".pdf""1""2026-08-26T17:31:02.619+00:00""978c975a556a433eb5bd41edb00d0ea3""private""0""controlled""df75a896bb1748f8bcae2747a2e3bbc8""1"6"0""Attachment 2 - NUWC - Raised Flooring Replacement - Sepcifications.pdf"427542"file"".pdf""1""2026-08-26T17:31:02.619+00:00""a49a86029fb64143b3ed21e89a75403d""private""0""controlled""24ccd87464f2495bb0509eb45ecaa2f3""1"5"0""Attachment 3 - RI20260001 Davis Bacon _7_30_26.pdf"5958645"file"".pdf""1""2026-08-26T17:31:02.619+00:00""912499c281df4988b571444adc156fcb""public""0""public""71ec8ec4911d43cbaf07f3301bdfdbe1""0"4"0""Attachment 4 - 07_5090-7 Hazmat Usage Log.pdf"1848744"file"".pdf""1""2026-08-26T17:31:02.619+00:00""e11e014e7a654d309523e5b86b5f4e90""public""0""public""ab3745128be046969efa31cf1cd4fe85""0"3"0""Attachment 5 - 08_5090-8 Generator Usage Log.pdf"1147436"file"".pdf""1""2026-08-26T17:31:02.619+00:00""c2f5df28db3946cba78139e6bc301cda""public""0""public""ada7394798b842779d0a9f9c8819550a""0"2"0""Attachment 6 - SITE VISIT INSTRUCTIONS .pdf"262152"file"".pdf""1""2026-08-26T17:31:02.619+00:00""4c061010b3e943049c9f97e2620b6c38""public""0""public""086486e8617141cca7ece2058b13ad3f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice cd001ab01190461ca2e80276ca77405f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.