To All Prospective Offerors,
Fermi Forward Discovery Group, LLC (FFDG) is seeking a contractor for Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50 at Fermi National Accelerator Laboratory located in Batavia, IL.
This acquisition is being advertised as a 100% small business set-aside and as a lowest price technically acceptable procurement.
The NAICS Code for this procurement is 238220, Plumbing, Heating and Air-Conditioning Contractors.
FFDG REQUIRES ALL SUBCONTRACTOR EMPLOYEES AND SUB-TIER SUBCONTRACTORS COMING ON TO THE FERMILAB AND SOUTH DAKOTA DEPARTMENT OF ENERGY LEASED SITES TO COMPLY WITH REAL-ID REQUIREMENTS. FOR MORE INFORMATION, PLEASE GO TO https://eshq.fnal.gov/realid/
SITE VISIT: A site visit is scheduled for September 15, 2026, at 10:00 AM. Visitors should meet in the west entrance lobby of Wilson Hall at the designated time.
Each Offeror is considered a business visitor and is required to fill out an Access Request form no later than Sept 14, 2026, at:
https://fermi.servicenowservices.com/expert_shell.do?sysparm_sys_id=63f9f6a8dbd148104e65ff621f961975
Upon request approval, the business visitor will receive an informal invitation letter with a QR code, which you must present at the security gate.
If the individual has not submitted the request, the business visitor will be denied entry. Note that onsite access will be dependent on citizenship status. If you are a Foreign National, access may be delayed or denied. If you have a current Fermilab badge, you are not required to fill out the Access Request form.
Please notify me at ryanosul@fnal.gov if you plan on attending.
Offerors are requested to submit questions relative to the RFP and should be submitted via email to ryanosul@fnal.gov. All questions shall be submitted in writing no later than Sept 18, 2026
Please submit the below with your proposal:
• Exhibit P - Proposal Form
• Certificate of Insurance
• Completed SARC
• Completed PUR-466
• Completed attachment CESHC
• Completed Injury & Data Questionnaire
• Completed Bid Bond
• Completed Exhibit K: SF-1413
• Corporate safety and quality plan per exhibit C and E
The contractor shall supply all material, labor, tools, and oversight to complete fire sprinkler repairs at four locations: Lab 1 – replace about 14-ft of leaking 4-in pipes, elbow and Vic fittings, and install Vapor Shield pipe treatment system; Cross Gallery – replace leaking joint, about 10-ft of 6-in pipe, elbow, tee, and old flanges and gaskets; MI50 – replace about 20 feet of 4-in pipe, replace 28 sprinkler heads, rework/replace arm-overs and fittings, and perform an NFPA 5-yr internal assessment with a report; IB2A – replace about 10-ft of leaking 3-in pipe and Vic couplings, and install Vapor Shield pipe treatment system. The contractor must coordinate with Fermi Fire Techs to take systems out of service and place them back in service. Work shall be scheduled in this order: Cross Gallery, MI50, IB2A, then Lab 1.
We post new life safety opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""1.0 RFP ISD-381041-RO.pdf"813460"file"".pdf""1""2026-09-09T14:59:21.895+00:00""8a58494b328940cea7dc5e6dec7685fe""public""0""public""3c3bb31e49ee42aca768811c09d3c518""0"103"0""Exhibit A - SOW_XGal_IB2A_Lab1_MI50.pdf"249684"file"".pdf""1""2026-09-09T14:59:21.895+00:00""f0066aaca0ec4c5c91f0a6918af76f6d""public""0""public""1d4d0c64bf78410abaf7546d49bc4b27""0"101"0""Exhibit B - 010010_General_Requirements.pdf"324672"file"".pdf""1""2026-09-09T14:59:21.895+00:00""e0b3e2fd80f940af9af32d36fc1c56d7""public""0""public""2a9317aff7ab4f4a911e9d75684910dc""0"98"0""Exhibit C - 013100_ESH_Requirements.pdf"1146660"file"".pdf""1""2026-09-09T14:59:21.895+00:00""85eef1ef4cee4fb49cd88cc1d8563955""public""0""public""ea3602157fd74dbc959e0db95e74b9b5""0"97"0""Exhibit D - 013300_Submittals_FermiForward.pdf"149124"file"".pdf""1""2026-09-09T14:59:21.895+00:00""2cba4d8bf65e4e3a84cd6e86e95dd49b""public""0""public""74daa138f0ba4e13b7d8477365c244a3""0"96"0""Exhibit E - 014100_Quality_Requirements.pdf"825141"file"".pdf""1""2026-09-09T14:59:21.895+00:00""43c885317edf47139637e41e06c34f64""public""0""public""52abac5c44dd45c3823d61c44050ebf1""0"95"0""Exhibit Q - Proposal Form ISD-381401-RO Fire Sprinkler Replacement.pdf"1061625"file"".pdf""1""2026-09-09T14:59:21.895+00:00""d3a13033089a4ffda7f10d28530faa42""public""0""public""d12b777711ea4b7d8223bb92c360970b""0"94"0""Exhibit G - 2025 Construction Insurance Requirements.pdf"239355"file"".pdf""1""2026-09-09T14:59:21.895+00:00""948a31c017b044f79bfd71b35d11a34c""public""0""public""1dca053087f94e1dac8f3c665a703551""0"86"0""Exhibit H - Bond Bid FL-41.pdf"767109"file"".pdf""1""2026-09-09T14:59:21.895+00:00""88029f76c18f466198732ae32ccda94f""public""0""public""ebdc83db30474ae4a9e949a799ddc941""0"85"0""Exhibit I - Bond Payment FL-42.pdf"765207"file"".pdf""1""2026-09-09T14:59:21.895+00:00""67defa4079d74a6091f0f07b057a0c21""public""0""public""60ce692d62934279a0414758f3bf9b7e""0"84"0""Exhibit J - Bond Performance FL-40.pdf"760783"file"".pdf""1""2026-09-09T14:59:21.895+00:00""78c87d06a5db4253a4d2c3a0454c2796""public""0""public""fbf3982df9f94eb091d61abac5482852""0"83"0""Exhibit K - SF1413.pdf"142738"file"".pdf""1""2026-09-09T14:59:21.895+00:00""628c8fd5baa14bf68c126f093634f829""public""0""public""2b66d8d9ec964a889832b56ccaff7385""0"82"0""Exhibit L - Fermilab Subcontractor Safety Information Questionnaire.pdf"979335"file"".pdf""1""2026-09-09T14:59:21.895+00:00""b1ddf2bfab954b798f770299e607a49d""public""0""public""2fbb899bb2494761bd4cba37e1b45e4c""0"81"0""Exhibit M - Construction Environmental Safety Health Certification.pdf"553666"file"".pdf""1""2026-09-09T14:59:21.895+00:00""5631e73cc219482786110b5f5bda73e3""public""0""public""33e5033f1715431dbbd00707a9fc2c18""0"67"0""Exhibit N - SARC_Subcontractor Annual RepsCerts.pdf"487204"file"".pdf""1""2026-09-09T14:59:21.895+00:00""a912f2c212714d11ada87e84e71ac456""public""0""public""01f66b81478943d99735b16b4b631a6f""0"66"0""Exhibit O - PUR-466_Proposal Certifications.pdf"487205"file"".pdf""1""2026-09-09T14:59:21.895+00:00""0e2aec078c784e2ea81a0b7f812f2d00""public""0""public""55791d286d444d95a0312b0f8aafb9ea""0"45"0""Exhibit F - FFDG General Terms and Conditions for Construction (08.2025).pdf"327220"file"".pdf""1""2026-09-09T14:59:21.895+00:00""6ab7b186886a4af580509d2de3449931""public""0""public""1afb5a382f71466aa6ef3cf72ab6c84a""0"17"0""Exhibit P - Davis Bacon Wage Rates General Decision IL20260008 Mod 2.txt"52828"file"".txt""1""2026-09-09T14:59:21.895+00:00""82b2cc056bf24851ab4bb9d37e25ef03""public""0""public""abe2e026293b4e84a3bc31554d15835e""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice c55e1a2461884e65b074e8664c722452), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.