Replace Building Ramp
The contractor provides all tools, labor, equipment and supervision to install two prefabricated aluminum ramp runs totaling about 100 feet, with non-skid deck panels, transition landings, picket rails, transition and bridge plates, hurricane tiedowns, stanchion legs and concrete pilaster pads. The contractor demolishes and removes the existing wooden ramp, disposes of construction waste, and designs the system, including PE-stamped drawings, for VA review and approval. Work follows the VA Barrier Free Design Guide (PG-18-13) and the 2010 ADA Standards.
We post new metalwork opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""36C24626Q1086 0001.docx"32319"file"".docx""1""2026-10-06T16:32:28.852+00:00""b8a6934775f34d3eae0a7907b741a4f2""public""0""public""6543e069cc6d4b25a9212e0f2c804faa""0"4"0""P07--Wage Determination Asheville.pdf"257428"file"".pdf""1""2026-09-22T15:05:24.891+00:00""58bc9fdc8d5e477caa8563a26cb3c3f2""public""0""public""22e3b6674b834b07943c8ba498d034ba""0"3"0""Salient Chracteristics.docx"15070"file"".docx""1""2026-09-22T15:05:24.891+00:00""6c01d370aeaa425d8d4ce89dbc73e044""public""0""public""5ed07cee1f974a258fe8c517504bd729""0"2"0""36C24626Q1086.docx"84193"file"".docx""1""2026-09-22T15:05:24.891+00:00""b75f88d2c16b4f4780709e72bc446969""public""0""public""7359e9e4275c42d8ab4687cf819a322c""0"1"0"Most North Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c487051a6b5d481c878bdfd957428450), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.