Read the notice and its 5 attached documents and pull out the scope, the deadlines and what you have to submit.
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the
entirety of the tank, and replace the audible and visual alarms.
o Fix the remote containment basin drainage issue.
o Replace the asphalt on the NE side of the fueling facility.
o Repair the refueler parking concrete.
o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump.
o Replace the asphalt near the loading/unloading facility with a concrete path.
o Replace POL building of the same size and at the same location.
o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS.
o Relocate the generator that is inside the compartmentalized area.
We post new asphalt opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"68102-4901""OMAHA""NE""USA""KO CONTRACTING OFFICE""1616 CAPITOL AVENUE""Solicitation - W9128F27RA045.pdf"7643970"file"".pdf""1""2026-10-22T20:53:15.397+00:00""65ec200884e8407e9a01ee4505e16825""public""0""public""8318e61614ee4ce5951ea757b9130222""0"15"0""27-R-A045-Specs.pdf"7926748"file"".pdf""1""2026-10-22T20:53:15.397+00:00""b4b1193e2c024a61baab6283d52a2237""public""0""public""198cf8467f8849909f81de643d5176f6""0"14"0""Davis Bacon Wage Determinations - CA20260007.pdf"238147"file"".pdf""1""2026-10-22T20:53:15.397+00:00""7a86d8d9e872489a8e5c44069fc909b4""public""0""public""54faabe8a8d44a43a8b61a15a713d3c7""0"13"0""Mather Selection Criteria.pdf"209458"file"".pdf""1""2026-10-22T20:53:15.397+00:00""c703d6897553483aa7a1046cfdec725b""public""0""public""cdb47e3a1080444780066e87fd40814f""0"12"0""RFP Drawings.pdf"3157785"file"".pdf""1""2026-10-22T20:53:15.397+00:00""af544e5a711e41eca684398da99fe2d4""public""0""public""3a47c7bd8119436e9e50f9c7f1f9a5a8""0"11"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice c1db70a0897e40c99faa13096f8cffab), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.