Amendment 0002 - is to post the pre-bid site visit sign-in sheet. See S06 - 36C25226B0011 0002 and attachment S06 Pre-bid Site Visit Sign-in Sheet.
Amendment 0001 - is to provide site visit location information details. See S06 - 36C25226B0011 0001 and attachment S06 - Ogden Entrance Location.
The Contractor must provide all tools, materials, components, labor, and supervision necessary to complete project 537-24-101 Modernize the Damen elevators 1 through 8 as well as the Morgue elevator at Jesse Brown VA Medical Center, Chicago, IL, in accordance with the construction documents, drawings, and specifications.
The contractor must provide all tools, materials, components, labor, and supervision to modernize elevators P1, P2, P3, P4, S5, S6, P7, P8, and M1 in Building 1A. Work includes selective demolition and removal of existing elevator equipment and related mechanical and electrical items; installation of new elevator machinery, controllers, hoistway doors, and hallway fixtures; new sump pumps in elevator pits; upgrades to associated mechanical, electrical, and communications systems; and alterations to associated partitions and finishes. The work is to be performed in five phases to maintain hospital operations, with each phase including temporary construction/dust/ICRA control barriers, renumbering of elevators, and completion of elevator inspections.
We post new electrical opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""S06 - Pre-bid Site Visit Sign-in Sheet.pdf"157799"file"".pdf""1""2026-08-31T21:25:08.536+00:00""133b495ecccb483481a4ccc6da2711d8""public""0""public""870f0c1980094ce5997971de770573e8""0"10"0""S06 - 36C25226B0011 0002.pdf"98283"file"".pdf""1""2026-08-31T21:25:08.536+00:00""83418ba7a4ee42ea87f755da376ff881""public""0""public""f756b5bd1af941028bac5cdae791a07f""0"9"0""S06 - Odgen Entrance Location.pdf"80716"file"".pdf""1""2026-08-19T18:56:27.305+00:00""fcd54bbbd6f1424dba4cde5d99055bd0""public""0""public""498edcf4342d46a184f5c140c74b4fd7""0"8"0""S06 - 36C25226B0011 0001.pdf"103772"file"".pdf""1""2026-08-19T18:56:27.305+00:00""dd2b776c292e4aefa73a61ced485983b""public""0""public""2bd1df9e8fea4412855e9a1d4ac3b4c5""0"7"0""S02 - Exhibit 1 - 537-24-101 IFB Drawings.pdf"22690309"file"".pdf""1""2026-08-18T11:43:50.362+00:00""ef2ec92b2be24c26b221e4dfe1b003b6""public""0""public""b6a267d8f5be45e786b2e8dfa80b6d25""0"6"0""S02 - Exhibit 2 - 537-24-101 - IFB Specifications.pdf"8233706"file"".pdf""1""2026-08-18T11:43:50.362+00:00""2514c6ba94d7424994137748ed480454""public""0""public""234c65920d964813bf7830bca079b703""0"5"0""S02 - Exhibit 3 537-24-101 - SOW - SOC Floor Plan.pdf"7877406"file"".pdf""1""2026-08-18T11:43:50.362+00:00""e30e16e5f42b407aae00d6b52b3ba5eb""public""0""public""ae17cc8601904975909163cc7757be15""0"4"0""S02 - Wage Determinations IL20260009 05182026.pdf"4122433"file"".pdf""1""2026-08-18T11:43:50.362+00:00""50554ee8f12141c9a6813df5e4163875""public""0""public""b0aecc8ab74d4a6ea31b1bb11d35138c""0"3"0""S02 - Exhibit 3 537-24-101 SOW - Asbestos Survey Report.pdf"2180163"file"".pdf""1""2026-08-18T11:43:50.362+00:00""77b7330def03467d89d75a2d899f9f2d""public""0""public""48a4e8904bc346648f3208c1477a3cb5""0"2"0""S02 - 36C25226B0011 P.docx"300648"file"".docx""1""2026-08-18T11:43:50.362+00:00""e03d0ac6f88d43febf0093488f49881e""public""0""public""670ae914633a44d79507018e29702186""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice beed96a96fd548febc36283b80339c37), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.