REQUEST FOR QUOTE
BFO NFO Manual Cutting and Scattering
Bureau of Land Management (BLM) Wyoming
Buffalo Field Office/ Newcastle Field Office
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation #140L3726Q0181 is issued as a Request for Quotes (RFQ). This RFQ is being issued as a total set-aside for small business. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
Description Quantity UOM Unit Price Total
CLIN 00010 North Buffalo Creek 1,566 Acre $ $
CLIN 00020 North Windmill Creek 618 Acre $ $
CLIN 00030 Buck Draw 2,844 Acre $ $
TOTAL 5,028 Acre $
Description: The Department of the Interior (DOI), Bureau of Land Management (BLM) Wyoming has a requirement for manual lop and scatter for fuels reduction, conifer encroachment, improvement of grassland sagebrush steppe health, and grazing and wildlife habitat improvement on approximately 5,028 acres managed by the Buffalo and Newcastle Field Offices (BFO/ NFO). Details for this requirement can be found in the attached Performance Work Statement and maps.
NAICS: 115310 Exception 2 - Support Activities for Forestry-Fuels Management
PSC: F003 ¿ Natural Resources/ Conservation ¿ Forest-Range Fire
Period of Performance: December 1, 2026 ¿ August 15, 2027
Location: North Buffalo Creek is 18 miles northeast of Leiter, Sheridan County, Wyoming. North Windmill Creek is 25 miles southeast of Leiter, Campbell County, Wyoming. Buck Draw project area is approximately 10 miles south of the city of Moorcroft, WY. Please refer to the attached maps for location details.
The BLM intends to award a firm fixed-price contract resulting from this RFQ using the lowest price technically acceptable (LPTA) source selection method. In order to be considered technically acceptable, the vendor must demonstrate technical capability and capacity to complete the required work in accordance with the SOW and have satisfactory past performance.
In accordance with FAR Part 12 (RFO), offerors must include the following information with your quote submission:
Questions: Please submit any questions via email to the Contract Specialist for this action, David Farina, no later than Friday, September 25, 2026 @ 2:30 PM MDT.
Pre-Bid Meeting: Pre-bid meetings for each area will be offered as detailed in the PWS. Meetings are highly encouraged but not required. Interested attendees shall contact the PIs listed in the PWS at least 36 hours prior to the scheduled date and time.
The deadline for quote submission shall be Thursday, October 15, 2026 @ 2:30 PM MDT. Quotes received after the deadline will not be considered. All quotes shall be submitted via email to David_farina@ios.doi.gov.
Attachments:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and incidental services necessary to perform manual cutting and scattering of all Rocky Mountain juniper on three units: North Buffalo Creek (1,566 acres), North Windmill Creek (618 acres), and Buck Draw (2,844 acres). Work includes cutting stumps flat no more than 4 inches high on the uphill side, removing all branches from stumps and tree boles, cutting severed material to less than 4 feet in length and lopping to less than 18 inches in height, and manually scattering material to prevent heavy fuel concentrations. The contractor must use Avenza or similar GPS mapping to navigate unit boundaries, close all gates, and comply with fire protection requirements including year-round firefighting tools, fire watch from June 1 to October 15, and shutdowns during Extreme or Red Flag conditions.
We post new agriculture & food opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""83705""BOISE""ID""USA""3833 SOUTH DEVELOPMENT AVENUE""Sol_140L3726Q0181.pdf"182786"file"".pdf""1""2026-09-08T15:14:21.824+00:00""a876d220c146403c80e620a621effc68""public""0""public""b9269b32cef54930a775dd82e8dc37a3""0"11"0""B08_Attachment_1_PWS_NFO_BFO_Conifer_Removal.pdf"379422"file"".pdf""1""2026-09-08T15:14:21.824+00:00""9403b84f685f47468fda13b781eeab38""public""0""public""8db6e41e935545f298d29a2e4d4ff4f0""0"10"0""B08_Attachment_2_Buck_Draw_Project_Map.pdf"1172143"file"".pdf""1""2026-09-08T15:14:21.824+00:00""53f2a78a2d0a4f49be6ccfd409958e78""public""0""public""39df0ff873e24a4dba1534fac7a2bc40""0"9"0""B08_Attachment_3_Buck_Draw_Vicinity_Map.pdf"512839"file"".pdf""1""2026-09-08T15:14:21.824+00:00""e168e5119d974c85b96e6c87d2d361e2""public""0""public""4697178fd67a4c10bc60dd64c12ab67e""0"8"0""B08_Attachment_4_North_Buffalo_Creek_Unit_Map.pdf"3484009"file"".pdf""1""2026-09-08T15:14:21.824+00:00""684aa052324b44f7a6eff557eed99c90""public""0""public""651ba7e394624c8c9c6566cb3513ea79""0"7"0""B08_Attachment_5_North_Buffalo_Creek_Vicinity_Map.pdf"1066397"file"".pdf""1""2026-09-08T15:14:21.824+00:00""83225dcea5304b5ea7a2375aca97287c""public""0""public""a2043a4d914746fbb148cc50995d2e29""0"6"0""B08_Attachment_6_North_Windmill_Creek_Unit_Map.pdf"2963785"file"".pdf""1""2026-09-08T15:14:21.824+00:00""f1e4b8d95eb84eda8247d876fa752320""public""0""public""fdd3502a57b74c86a6310f96ac1bf038""0"5"0""B08_Attachment_7_North_Windmill_Creek_Vicinity_Map.pdf"1202628"file"".pdf""1""2026-09-08T15:14:21.824+00:00""280e15f64c814e58ac635e3b67d0e6d4""public""0""public""0ddb8249ba75449c9dbaf4ee2ddd31ad""0"4"0""B08_Attachment_8_Wage_Determination_1979-0948_Rev_77.pdf"1400680"file"".pdf""1""2026-09-08T15:14:21.824+00:00""811444ce07634cdca7edd7e18132cee9""public""0""public""415fbd81fa5541159a5401f36d9b3e8a""0"3"0""B08_Attachment_9_Clauses_and_Provisions.pdf"230691"file"".pdf""1""2026-09-08T15:14:21.824+00:00""8df370f1a0fe49a28e6143c9018789c5""public""0""public""26af9fb4104e40939ec6b49ea45648f5""0"2"0""B08_Combined_Synopsis_Solicitation.pdf"130271"file"".pdf""1""2026-09-08T15:14:21.824+00:00""f78303f93e014c6db247a7c31138c33a""public""0""public""8fca3a573f2a4b27b25452d1bd6d2c3a""0"1"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice bbeea1cc62df41969dcc07dffc8540c7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.