This project is needed to expand the capabilities of the current driving range and its driving range technology to support current demand of increased play and driving range usage. The renovation will repair the existing driving range bays and add an additional 12 hitting bays by adding a two-story hitting deck required by increased customer volume.
The work includes full replacement of the existing driving range, adding a two-story, 24-bay covered hitting structure with a ball-tracking system, and improving food and beverage options with an adjacent concession. The Contractor shall demolish and remove existing turf, range concrete, and the existing range maintenance building; grade the project site; remove dead brush and dying trees; adjust, relocate, or replace existing irrigation and electrical systems; relocate the bunker and chipping practice areas; increase the length of the driving range by approximately 30 yards; construct a 2-story, 24-bay covered range structure with weather-resistant lighting, ceiling fans, and roof-mounted light fixtures; install a golf range technology system; construct a new 440-square-foot range building and a new 500-square-foot Concession Building with restrooms; construct a concrete cart path extension; and install 150 linear feet of high-impact range netting.
We post new goods & materials opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"38055-6500""MILLINGTON""TN""USA""DET MILLINGTON""5720 INTEGRITY DRIVE""NAMVWR-27-R-0001 Amendment 0001.pdf"191835"file"".pdf""1""2026-10-15T17:37:07.794+00:00""fbd118811d5f4d15be2c1eaa15c5d931""public""0""public""97065badb7bf4cf8bcf20ae1d01fcbba""0"2"0""RFP - NAVMWR-27-R-0001 Monterey Driving Range Technology.pdf"8418403"file"".pdf""1""2026-10-07T17:42:42.687+00:00""ef63b82a398546f18e81776910f6a465""public""0""public""dd98eb89c9d94a5fbbf169412defd728""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice b40e2bb8975748a79e0cd725b1953ecb), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.