Light RFP
← All government bids
Federal · SAM.gov · Fresno, CA

Paint and Lights Bldg 102 & Bldg 110

Due Jul 17, 2026·18 days left·Electrical, Painting, FencingView official posting ↗
Issuing agency
Department of Defense
Method
Solicitation
Category
Construction · NAICS 238320
PIN
W50S6T26QA027
Location
Fresno, CA
Posted
Jun 16, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

This requirement is for painting interior surfaces and upgrade lighting in office space and two vehicle workshops. Preparatory work will include repairing walls, sanding, and priming. Approximately 2,000 square feet of office space, and 5,500 square feet of production areas will be painted. The contractor will not be responsible for moving furniture nor equipment, but they must ensure it is protected. The contractor will also be responsible for replacing all interior incandescent light bulbs with LED bulbs

Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil

A site visit is tentatively scheduled for Wednesday 24 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions.

Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site.

As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:

(A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.

(B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:

Selected Agency: DEPT OF THE ARMY

Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts

30 days or less: 0

31 to 60 days: 1

61 to 90 days: 0

91 to 180 days: 0

181 to 365 days: 1

Greater than 365 days: 1

After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2

Documents5
Base Access Request - 144 SFS DVES FORM (20240320).pdfPDF
Solicitation - W50S6T26QA027 Professional Appearance.pdfPDF
Statement of Work HAYW262012 - Paint and Lights.pdfPDF
Wage Determination CA20260018 Rev 5 18 May 2026.pdfPDF
Technical Factors 26QA27.pdfPDF

Contact

Name
Justin Scales
Phone
5594545129
Address
Fresno, CA 93727
Full source recordfrom SAM.gov
Type
Solicitation
Title
Paint and Lights Bldg 102 & Bldg 110
Active
Yes
Base Type
Solicitation
Notice Id
b073123db8794bda98213a5f1498fe95
Naics Code
238320
Department
DEPARTMENT OF DEFENSE
Posted Date
Jun 16, 2026
Point Of Contact
Type
primary
Email
justin.scales.1@us.af.mil
Phone
5594545129
Full Name
Justin Scales
Type
secondary
Email
jarrod.sanchez@us.af.mil
Phone
5594545129
Full Name
Jarrod Sanchez
Description Text
This requirement is for painting interior surfaces and upgrade lighting in office space and two vehicle workshops. Preparatory work will include repairing walls, sanding, and priming. Approximately 2,000 square feet of office space, and 5,500 square feet of production areas will be painted. The contractor will not be responsible for moving furniture nor equipment, but they must ensure it is protected. The contractor will also be responsible for replacing all interior incandescent light bulbs with LED bulbs Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a small business set-aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil A site visit is tentatively scheduled for Wednesday 24 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions. Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2
Response Dead Line
Jul 17, 2026
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.NGB.W7MX USPFO ACTIVITY CAANG 144
Place Of Performance
Zip
93727
City
Code
27000
Name
Fresno
State
Code
CA
Name
California
Country
Code
USA
Name
UNITED STATES
Solicitation Number
W50S6T26QA027

Source: SAM.gov (notice b073123db8794bda98213a5f1498fe95), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.